Find or Sell Used Cars, Trucks, and SUVs in USA

1996 Used 5.7l V8 Manual 6 Sp Grand Sport Black Glass Top Leather Ls No Reserve on 2040-cars

Year:1996 Mileage:95202
Location:

Moscow Mills, Missouri, United States

Moscow Mills, Missouri, United States
Advertising:

Auto Services in Missouri

Total Tinting & Total Customs ★★★★★

Automobile Parts & Supplies, Truck Accessories, Window Tinting
Address: 796 Hoff Rd, Saint-Paul
Phone: (636) 474-8468

The Auto Body Shop Inc. ★★★★★

Auto Repair & Service, Automobile Body Repairing & Painting, Insurance
Address: 6665 Center Grove Rd, West-Alton
Phone: (618) 656-6545

Tanners Paint And Body ★★★★★

Auto Repair & Service, Automobile Body Repairing & Painting, Dent Removal
Address: 2070 E Pythian St, Verona
Phone: (417) 865-4385

Tac Transmissions & Custom Exhaust ★★★★★

Auto Repair & Service, Auto Transmission, Mufflers & Exhaust Systems
Address: 320 S Bernhardt Ave, Gerald
Phone: (573) 764-5540

Square Deal Transmission ★★★★★

Auto Repair & Service, Automobile Parts & Supplies, Auto Transmission
Address: 9725 Manchester Rd, Saint-Ann
Phone: (314) 968-7500

Sports Car Centre Inc ★★★★★

Auto Repair & Service, Brake Repair, Emissions Inspection Stations
Address: 1866 Larkin Williams Rd, Valley-Park
Phone: (636) 343-8363

Auto blog

Race Recap: 2013 Twelve Hours of Sebring, cakewalk up front, grindfest out back [w/spoilers]

Tue, 19 Mar 2013

This year's 12 Hours of Sebring wasn't exactly a foregone conclusion because we're still talking about racing, and anything can happen when the speeds are as high as the adrenaline and the desire. But we're still talking about Audi bringing it's two top-spec racers - and its huge budget and its nearly neurotic attention to detail - to a race that it uses as a test bed for The 24 Hours of Le Mans and as a way to open the endurance racing season with a victory.
Besides, 12 hours is a long time, especially at Sebring, and things didn't go all Audi's way. On top of that, although it was a pretty quiet race, behind the Audis things got even grimier, with plenty of battles, plenty of mechanical issues, and the new BMW Z4 GTE and Viper GTS-R being race tested. Oh, and that brand new chromed-out DeltaWing...

2016 Camaro gets most revealing tease yet

Mon, May 11 2015

Chevrolet started its long teaser campaign for the 2016 Camaro by just revealing the exhaust manifold and front frame, but as time has passed the company has slowly unveiled more. In the latest glimpse ahead of the pony car's May 16 debut, we're actually getting to see the model's profile completely undisguised. As suggested by the recent tease of the rear and hood, the 2016 Camaro wears a sharper, more angular design than the current model. This is especially the case when you look at the taut lines making up the rear. Chevy claims that the new shape underwent 350 hours of wind tunnel tests to be able to generate left lift, improve cooling and reduce wind noise in the cabin. A smooth underbody pan is among the aerodynamic tweaks, and it runs from underneath the front grille to the center of the Camaro. Chevy asserts that all of the changes at the front help reduce lift by 30 percent. Related VIdeo: 2016 Camaro is all about the Aero Total aerodynamic lift improved by 30 percent for improved stability 2015-05-11 DETROIT – After 350 hours of wind tunnel testing – often 24 hours a day – the new Camaro will slip more easily through the wind, and drivers of the Camaro SS will experience a marked improvement in reduced aerodynamic lift. These changes illustrate the lengths the aerodynamics team went to for improved performance, stability, cooling and lower wind noise intrusion "The importance of aerodynamics increases exponentially as we increase vehicle performance," said Kirk Bennion, Exterior Design manager. "As engine output increases, we need more engine cooling. As acceleration and top speeds climb, we need to reduce lift for better high-speed stability. However, we cannot make any changes at the expense of increasing drag, which can hurt fuel economy. "To balance these different aerodynamic targets, we tested literally hundreds of changes on the new Camaro, millimeters at a time." For example, the initial design called for the lower grille bars to be set at a 20-degree angle to the horizon. However, after meticulous testing, the team improved engine-cooling airflow by 1 percent by shifting the angle to 13 degrees – a change that achieved the airflow target while maintaining the original grille design. And rather than a traditional front air dam to reduce aerodynamic lift, the team developed a flush belly pan that stretches from the front grille to the center of the vehicle.

GM adds 1,200 jobs at Detroit-Hamtramck plant

Thu, Oct 22 2015

General Motors is making a big move at its Hamtramck, MI, factory, announcing it will add a second shift and hire over 1,200 workers within the next several months. It's expected that by early 2016, the factory will employ over 2,800 workers to build the Chevrolet Volt, Impala, Malibu, Cadillac ELR, and by early next year, the new CT6. According to GM Hamtramck spokesperson Courtney Zemke, 40 of the 1,200 positions are for salaried employees, while the remainder will be hourly positions. As for where these employees will go, positions are being made available across the factory, so GM isn't focusing on any particular area for its new hires. It's a similar story behind the hiring surge itself. GM said in its press release that the "second shift is necessary to meet forecasted market demand," a position Zemke reiterated. It's a matter of demand across the plant's portfolio, rather than any one particular product seriously outstripping supply. Naturally, the United Auto Workers is happy with the move. "The workforce at Detroit-Hamtramck is second to none," UAW Local 22 Shop Chairman Don LaForest said in the attached release. "We appreciate the opportunity to expand our UAW-GM family." Hiring is going on now, with the second shift slated to get underway in early 2016. GM's Detroit-Hamtramck Assembly to Add Second Shift and More Than 1,200 Jobs Plant will nearly double its workforce by early 2016 2015-10-22 DETROIT – General Motors is nearly doubling its workforce at Detroit-Hamtramck Assembly by adding a second shift and more than 1,200 hourly and salaried jobs. The addition of a second shift will increase the plant's workforce to approximately 2,800 people when hiring is completed. The second shift is necessary to meet forecasted market demand for the five cars produced at Detroit-Hamtramck. "This is the result of the award-winning vehicles Detroit-Hamtramck produces and the confidence GM has in our team to build world-class quality for our customers," said Plant Manager Gary West. Second shift hiring is underway, and the shift is scheduled to begin operations in early 2016. "The workforce at Detroit-Hamtramck is second to none," said UAW Local 22 Shop Chairman Don LaForest. "We appreciate the opportunity to expand our UAW-GM family." The 4.1 million-square-foot Detroit-Hamtramck Assembly opened in 1985. GM has invested $1 billion in the plant over the last six years, making it one of the company's most-agile manufacturing facilities in North America.