Find or Sell Used Cars, Trucks, and SUVs in USA

1970 Chevrolet Corvette Convertible on 2040-cars

US $23,200.00
Year:1970 Mileage:76311 Color: Blue /
 Blue
Location:

Glendale, Arizona, United States

Glendale, Arizona, United States
Advertising:

If you have questions email email me at: erikastave@netzero.net .

1970 Corvette Convertible

-Complete Matching Numbers Drive-train: 454/390hp
-4 Speed Manual Transmission
-Posi Rear.
-Code 976 Mulsanne Blue Exterior with Blue Leather Interior
-Matching Auxiliary Black Hard Top (with convertible White soft top)
-Factory A/C
-Tilt Colomn
-Power Steering
-Power Brakes
-AM-FM Radio
-Rally Wheels wrapped with BFG Radial Tires.

Auto Services in Arizona

Tri-City Towing ★★★★★

Auto Repair & Service, Automotive Roadside Service, Towing
Address: 751 E Aspen St, Peeples-Valley
Phone: (866) 595-6470

T & R upholstery & Body Works ★★★★★

Automobile Body Repairing & Painting, Automobile Seat Covers, Tops & Upholstery, Draperies, Curtains & Window Treatments
Address: 3880 Andy Devine, Kingman
Phone: (928) 757-7700

Super Discount Transmissions ★★★★★

Auto Repair & Service, Auto Transmission
Address: 3220 E McDowell Rd, Phoenix
Phone: (602) 273-6431

Stamps Auto ★★★★★

Automobile Parts & Supplies, Automobile Accessories, Battery Supplies
Address: 9123 E Southern Ave, Apache-Jct
Phone: (480) 986-3602

Solar Ray Auto Glass Repair ★★★★★

Auto Repair & Service, Glass-Auto, Plate, Window, Etc, Windshield Repair
Address: 3370 N Hayden Rd, Paradise-Valley
Phone: (480) 648-2022

Sierra Toyota ★★★★★

Auto Repair & Service, New Car Dealers, Used Car Dealers
Address: 2596 E Fry Blvd, Sierra-Vista
Phone: (877) 245-9461

Auto blog

Chevy Volt gets customer satisfaction 'recall' for rear hatch issue *UPDATE*

Mon, Jan 26 2015

Last week, General Motors has issued a "Customer Satisfaction program" for some 2011-2015 model year Chevrolet Volts to fix the manual rear lift gate not working as appropriate. According to Volt owner posts on Facebook, the problem manifests itself by the hatch not opening up all the way (sometimes worse in the cold) with some people bumping their heads. Dealers will replace the lift gate struts as part of the program. Some drivers were notified through the vehicle's OnStar system that there is a problem. GM has not yet said how many Volts are affected. *UPDATE* This program is for all 2011-2015 model year Volts. Chevrolet spokesperson Michelle Malcho told AutoblogGreen that, "This is not a recall, so there won't be any formal information posted on the GM website." The fixes will be free to affected Volt owners. Some 2010-2015 Cadillac SRX vehicles are also affected by the same problem and will also be fixed. Featured Gallery 2011 Chevrolet Volt: Review View 22 Photos News Source: General Motors via Transport Evolved Green Recalls Chevrolet Electric Hybrid customer satisfaction

Here are your 2016 North American Car and Truck/Utility of the Year finalists [w/polls]

Tue, Dec 8 2015

The 2016 Detroit Auto Show will kick off with the announcement of the annual North American Car and Truck/Utility of the Year awards, and the three finalists in each category have just been revealed. Following this announcement, the jury – which includes Autoblog editor-in-chief Mike Austin – will re-evaluate each candidate before casting a final vote for the winner. This year's finalists are: Car of the Year Chevrolet Malibu Honda Civic Mazda MX-5 Miata Truck/Utility of the Year Honda Pilot Nissan Titan XD Volvo XC90 The 23rd annual awards will be announced on the morning of Monday, January 11. For now, we want to know where you stand. Let us know which vehicles you think should win, by voting in the polls below. Chevrolet Honda Mazda Nissan Volvo north american car of the year NACTOY

GM, Pilot will build EVgo fast chargers at 500 truck stops across U.S.

Thu, Jul 14 2022

All of our maps showing electric vehicle charging stations across the U.S. are going to need an update. Today, General Motors, Pilot and EVgo announced plans to work together on a nationwide DC fast charging network. The plan calls for 2,000 charging stalls that can deliver up to 350 kW to be installed at up to 500 Pilot and Flying J travel centers in the U.S. The goal is to have DC fast chargers available in 50-mile intervals across the country. The new charging stations will feature GM's "Ultium Charge 360" branding and "Pilot Flying J" logos but will not be limited to drivers of GM EVs. The plugs will use CCS connectors and be available to anyone. GM EV owners can take advantage of benefits, including the ability to make exclusive reservations, get discounts on charging costs and streamline the charging process with Plug and Charge and in-vehicle apps that can provide real-time charger availability. The first installation phase will take place in 2023, and "the bulk of the installations" should be completed by 2025, EVgo CEO Kathy Zoi said during a conference call with reporters announcing the plan. "We're gonna get going immediately and commence all of that engineering and planning stuff," she said. "We've got a pretty orderly plan." Pilot CEO Shameek Konar said the company expects the new EV charging stations to coexist with the current fuel infrastructure. "An average Pilot Flying J location is about 10 acres," Konar said. "This will be in addition to all of our gas pumps. The way I think about it is, this is a new source of energy that is going to coexist with gas for quite some time. We can debate how long, but we need to serve both groups of customers." Installing DC fast chargers at hundreds of Pilot's travel centers — aka truck stops — means there should be food, drinks, restrooms, WiFi and even showers available while you wait for an EV to charge. Pilot recently announced its “New Horizons” plan that will invest $1 billion in upgrading Pilot travel centers with more premium amenities, including expanded seating and lounge areas. While the exact amount of time it will take to charge an EV using these new stations will vary on the EV and its current state of charge, most EVs can refill from a low state of charge to around 80 percent in 20-30 minutes on a fast charger. The new stations are future-proofed to deliver up to 350 kW, a charge rate that few EVs today can handle.