1964 Chevrolet Corvette Restomod on 2040-cars
Delray Beach, Florida, United States
For more details email me at: timothy.parsens@zoho.eu .
Original 1964 roaster body
New Street Shop inc chassis with C4 suspension
GM Performance LS3 525 hp.
Side pipes w/ shields
Street Shop serpentine billet pulleys system
Vintage Air sure -fit AC and Heat
Tremic TKO 5 speed
QA1 adjustable coil over shocks
Dakata Digital VHX Gauges
Wilwood 6 piston front and 4 piston rear Brakes
HydroBoost Brake booster / Wilwood master cylinder
Flaming River polished tilt steering Colum
Billet Specialty custom Steering wheel
Custom Leather interior
Power window
Custom Retro look 1500 Watt stereo system
This Awesome Vette is a brand new build with No expenses spared , it has The best of the best with everything new
except the Original Corvette C2 convertible body,, This is truly one of the finest example of the classic C2
corvette look with the drivable and performance of a new C4 corvette …
Chevrolet Corvette for Sale
1967 chevrolet corvette(US $35,300.00)
2009 chevrolet corvette z06 coupe 2-door(US $24,300.00)
1968 chevrolet corvette original l71 convertible(US $48,100.00)
2016 chevrolet corvette manual(US $33,600.00)
2015 chevrolet corvette z51 coupe(US $34,700.00)
2014 chevrolet corvette 3lt(US $28,800.00)
Auto Services in Florida
Yokley`s Acdelco Car Care Ctr ★★★★★
Wing Motors Inc ★★★★★
Whitt Rentals ★★★★★
Weston Towing Co ★★★★★
VIP Car Wash ★★★★★
Vargas Tire Super Center ★★★★★
Auto blog
GM to idle Indiana truck plant for two weeks over chip shortage
Fri, Mar 25 2022WASHINGTON —General Motors said Friday it will idle for two weeks in April an assembly plant in Indiana that builds pickup trucks, over ongoing semiconductor chip shortages. The Detroit automaker said it will halt production at its Fort Wayne assembly plant, which builds the Chevrolet Silverado 1500 and GMC Sierra 1500, for two weeks starting April 4. "There is still uncertainty and unpredictability in the semiconductor supply base, and we are actively working with our suppliers to mitigate potential issues moving forward," GM said Friday. The automaker said this is its first semiconductor-related full-size truck production downtime since August. GM noted that overall it has "seen better consistency in semiconductor supply through the first quarter compared to last year as a whole. This has translated into improvement in our production and deliveries during the first three months of the year." GM Chief Executive Officer Mary Barra met with some lawmakers on Capitol Hill this week, including Republican Senator Todd Young of Indiana. GM is backing a bill in Congress to provide $52 billion in government subsidies to boost U.S. semiconductor manufacturing. GM said that legislation could help "alleviate the ongoing shortage that continues to impact U.S. automotive manufacturing." (Reporting by David Shepardson; editing by Jonathan Oatis) Related video:
GM plans to restart production in Mexico on May 20
Mon, May 18 2020MEXICO CITY — General Motors is tentatively planning to restart operations at its auto assembly plant in the Mexican city of Silao on May 20, according to a message to workers seen by Reuters on Sunday, as the car industry prepares to exit the coronavirus lockdown. Separately, the president of GM's Mexican unit advised suppliers to prepare to resume operations. “We are now beginning a new phase given the Mexican governmentÂ’s official announcement earlier this week to consider the transportation manufacturing industry as essential for the countryÂ’s economy,” Francisco Garza, president ofGeneral Motors de Mexico, wrote in an email to suppliers dated on Friday that was viewed by Reuters. The reopening of the plant in Silao would be a positive signal for the auto sector in North America, whose supply lines are highly interconnected between the United States, Mexico and Canada. The plant in the central state of Guanajuato has been idled for weeks due to the coronavirus outbreak. Workers had previously been told to plan to return to their jobs on May 18. A GM spokeswoman said the company could not confirm when it would restart operations at any of its facilities in Mexico because it is awaiting more guidance from the government. The message to the plant's workers came after the government on Friday clarified when the industry could begin easing restrictions imposed because of the health emergency. On Wednesday, the government said automakers could start going back into production from May 18. It then withdrew that advice and suggested the new start date would be June 1. Finally it indicated the sector, which forms the backbone of Mexican manufacturing, could begin operating as soon as next week if companies had the required safety measures in place. U.S. officials and its auto industry have pressed Mexico's government to get its factories open again because American operations depend heavily on parts from south of the border. However, some politicians are wary of opening too fast. Mexico registered its first case of coronavirus weeks after the United States and Canada and the toll of daily infections and deaths in the country reached new peaks over the past few days. The Silao production facility, which makes highly profitable pickup trucks for GM, is one of the biggest automotive plants in Guanajuato, a major Mexican carmaking state. Related Video:
GM, Pilot will build EVgo fast chargers at 500 truck stops across U.S.
Thu, Jul 14 2022All of our maps showing electric vehicle charging stations across the U.S. are going to need an update. Today, General Motors, Pilot and EVgo announced plans to work together on a nationwide DC fast charging network. The plan calls for 2,000 charging stalls that can deliver up to 350 kW to be installed at up to 500 Pilot and Flying J travel centers in the U.S. The goal is to have DC fast chargers available in 50-mile intervals across the country. The new charging stations will feature GM's "Ultium Charge 360" branding and "Pilot Flying J" logos but will not be limited to drivers of GM EVs. The plugs will use CCS connectors and be available to anyone. GM EV owners can take advantage of benefits, including the ability to make exclusive reservations, get discounts on charging costs and streamline the charging process with Plug and Charge and in-vehicle apps that can provide real-time charger availability. The first installation phase will take place in 2023, and "the bulk of the installations" should be completed by 2025, EVgo CEO Kathy Zoi said during a conference call with reporters announcing the plan. "We're gonna get going immediately and commence all of that engineering and planning stuff," she said. "We've got a pretty orderly plan." Pilot CEO Shameek Konar said the company expects the new EV charging stations to coexist with the current fuel infrastructure. "An average Pilot Flying J location is about 10 acres," Konar said. "This will be in addition to all of our gas pumps. The way I think about it is, this is a new source of energy that is going to coexist with gas for quite some time. We can debate how long, but we need to serve both groups of customers." Installing DC fast chargers at hundreds of Pilot's travel centers — aka truck stops — means there should be food, drinks, restrooms, WiFi and even showers available while you wait for an EV to charge. Pilot recently announced its “New Horizons” plan that will invest $1 billion in upgrading Pilot travel centers with more premium amenities, including expanded seating and lounge areas. While the exact amount of time it will take to charge an EV using these new stations will vary on the EV and its current state of charge, most EVs can refill from a low state of charge to around 80 percent in 20-30 minutes on a fast charger. The new stations are future-proofed to deliver up to 350 kW, a charge rate that few EVs today can handle.