1969 Chevelle on 2040-cars
Albuquerque, New Mexico, United States
Vehicle Title:Clear
Engine:468 CI BB Chevy
For Sale By:Private Seller
Mileage: 1
Model: Chevelle
Trim: 2 Door Hardtop Coupe
Power Options: Power Steering
Drive Type: Rear Wheel
1969 Chevrolet Chevelle. Engine and Transmission have less then a couple of hours on them. All the body work has been done, All the glass, Bumpers and fender wells go with it. Has 69 Chevelle Bucket seats and the rear back seat. Car needs interior,paint and trim. For anymore info call 505-228-7187
Chevrolet Chevelle for Sale
Frame off restored chevelle 502/502 hp v8 5 speed 3.55(US $49,900.00)
1967 ss chevelle original 138 big block code car
1970 chevelle ss 454(US $23,500.00)
1970 chevrolet chevy chevelle malibu l48 350 with build sheet and protecto plate
1970 chevrolet chevelle ss**big block 396**auto**factory ac*boss wheels*must see(US $32,500.00)
1966 chevelle super sport clone malibu(US $20,000.00)
Auto Services in New Mexico
Santa Fe Mazda & Volvo ★★★★★
Sacco Automotive ★★★★★
Ray`s Truck Service ★★★★★
Ray`s Truck Service ★★★★★
Pro`s Collision ★★★★★
Permian Gmc Cadillac Nissan Mitsubishi ★★★★★
Auto blog
Driving Granatelli's turbine-powered 1978 Chevy Corvette [w/video]
Thu, Jan 8 2015With its curvy snout and feminine haunches, the third-gen Chevrolet Corvette looks like a dreamy – if dated – exemplar of Sports Car Fantasy 101 when viewed through modern eyes. This particular specimen circa '78, clad in silver and black paint with red pinstripes, appears to be a well-preserved example from the era. Apart from its low-profile Pirellis, slightly raised and slotted hood, spacious stance and a certain hand-painted descriptor alongside its crossed flag logos, you'd never guess there's a Space-Age propulsion unit powering this Coke bottle-bodied ride. Climb inside, and you're presented with aircraft gauges and big, colorful square buttons in the center panel. It takes a push of the "Ignitor" button, a tap of the starter button, and a slide of a T-handle for this nearly 40-year-old sports car to start sounding like Gulfstream G650 ready for takeoff. Yep, you're sitting in an 880-horsepower, turbine-powered Corvette, the only one of its kind in the world. Welcome to the whoosh. What The...? Built by Vince Granatelli, son of Indy 500 guru Andy Granatelli, this curious Corvette came into being by cramming a Pratt & Whitney ST6N-74 gas turbine engine into the donor car's lengthy front end. The same type of Jet A-burning mill powered Granatelli Senior's STP-sponsored racecar at the 1967 Indianapolis 500, where it famously led most of the 198 of 200 laps until a $6 transmission bearing failed, knocking it out of the race. The idea of turbine power usurping internal combustion was so threatening that Indy's governing body restricted turbine performance into obsolescence thereafter. A turbine-powered Corvette sounds excessive because it is. But there are also things about this 880-horsepower, 1,161-pound-feet monster that might surprise you. While it smacks of futurist exoticism and cost a then-dizzying $37,000 in 1967, the Canadian-built powerplant uses 80 percent fewer parts than an internal combustion V8 and will run on virtually anything combustible – whiskey, diesel, even Chanel No. 5. Though it's triple the length of a V8, the Pratt & Whitney beast weighs only 285 pounds. It's also one hell of a robust workhorse, typically serving as an auxiliary power unit for commercial aircraft or a generator in oil fields, where it can run for tens of thousands of consecutive hours before needing an overhaul. To adapt the Chevrolet for jet duty, the nose section was gutted and a sub-frame was built to compensate for the loosey-goosey front end.
GM to idle Indiana truck plant for two weeks over chip shortage
Fri, Mar 25 2022WASHINGTON —General Motors said Friday it will idle for two weeks in April an assembly plant in Indiana that builds pickup trucks, over ongoing semiconductor chip shortages. The Detroit automaker said it will halt production at its Fort Wayne assembly plant, which builds the Chevrolet Silverado 1500 and GMC Sierra 1500, for two weeks starting April 4. "There is still uncertainty and unpredictability in the semiconductor supply base, and we are actively working with our suppliers to mitigate potential issues moving forward," GM said Friday. The automaker said this is its first semiconductor-related full-size truck production downtime since August. GM noted that overall it has "seen better consistency in semiconductor supply through the first quarter compared to last year as a whole. This has translated into improvement in our production and deliveries during the first three months of the year." GM Chief Executive Officer Mary Barra met with some lawmakers on Capitol Hill this week, including Republican Senator Todd Young of Indiana. GM is backing a bill in Congress to provide $52 billion in government subsidies to boost U.S. semiconductor manufacturing. GM said that legislation could help "alleviate the ongoing shortage that continues to impact U.S. automotive manufacturing." (Reporting by David Shepardson; editing by Jonathan Oatis) Related video:
GM adds 1,200 jobs at Detroit-Hamtramck plant
Thu, Oct 22 2015General Motors is making a big move at its Hamtramck, MI, factory, announcing it will add a second shift and hire over 1,200 workers within the next several months. It's expected that by early 2016, the factory will employ over 2,800 workers to build the Chevrolet Volt, Impala, Malibu, Cadillac ELR, and by early next year, the new CT6. According to GM Hamtramck spokesperson Courtney Zemke, 40 of the 1,200 positions are for salaried employees, while the remainder will be hourly positions. As for where these employees will go, positions are being made available across the factory, so GM isn't focusing on any particular area for its new hires. It's a similar story behind the hiring surge itself. GM said in its press release that the "second shift is necessary to meet forecasted market demand," a position Zemke reiterated. It's a matter of demand across the plant's portfolio, rather than any one particular product seriously outstripping supply. Naturally, the United Auto Workers is happy with the move. "The workforce at Detroit-Hamtramck is second to none," UAW Local 22 Shop Chairman Don LaForest said in the attached release. "We appreciate the opportunity to expand our UAW-GM family." Hiring is going on now, with the second shift slated to get underway in early 2016. GM's Detroit-Hamtramck Assembly to Add Second Shift and More Than 1,200 Jobs Plant will nearly double its workforce by early 2016 2015-10-22 DETROIT – General Motors is nearly doubling its workforce at Detroit-Hamtramck Assembly by adding a second shift and more than 1,200 hourly and salaried jobs. The addition of a second shift will increase the plant's workforce to approximately 2,800 people when hiring is completed. The second shift is necessary to meet forecasted market demand for the five cars produced at Detroit-Hamtramck. "This is the result of the award-winning vehicles Detroit-Hamtramck produces and the confidence GM has in our team to build world-class quality for our customers," said Plant Manager Gary West. Second shift hiring is underway, and the shift is scheduled to begin operations in early 2016. "The workforce at Detroit-Hamtramck is second to none," said UAW Local 22 Shop Chairman Don LaForest. "We appreciate the opportunity to expand our UAW-GM family." The 4.1 million-square-foot Detroit-Hamtramck Assembly opened in 1985. GM has invested $1 billion in the plant over the last six years, making it one of the company's most-agile manufacturing facilities in North America.





