1968 Chevelle Ss 396 Convertible Ss396 Automatic Numbers Matching Super Sport on 2040-cars
Chicago, Illinois, United States
Body Type:Convertible
Vehicle Title:Clear
Fuel Type:Gasoline
For Sale By:Dealer
Model: Chevelle
Mileage: 56,496
Warranty: Unspecified
Sub Model: SS 396
Exterior Color: Red
Interior Color: White
Number of Cylinders: 8
Chevrolet Chevelle for Sale
1970 chevrolet chevelle ss 396 a/t with a/c(US $23,000.00)
1969 chevolet chevelle ss396 coupe 4 speed(US $20,000.00)
1967 chevy chevelle ss
1970 chevelle with new 496ho 400 auto 3speed
1970 chevelle 2 door restoration project
1970 chevrolet chevelle ss red convertible big block 454 ls5 4 speed factory air
Auto Services in Illinois
Webb Chevrolet ★★★★★
Wally`s Collision Center ★★★★★
Twin City Upholstery Ltd. ★★★★★
Tuffy Auto Service Centers ★★★★★
Towing St. Louis ★★★★★
Suburban Wheel Cover Co ★★★★★
Auto blog
GM to idle Indiana truck plant for two weeks over chip shortage
Fri, Mar 25 2022WASHINGTON —General Motors said Friday it will idle for two weeks in April an assembly plant in Indiana that builds pickup trucks, over ongoing semiconductor chip shortages. The Detroit automaker said it will halt production at its Fort Wayne assembly plant, which builds the Chevrolet Silverado 1500 and GMC Sierra 1500, for two weeks starting April 4. "There is still uncertainty and unpredictability in the semiconductor supply base, and we are actively working with our suppliers to mitigate potential issues moving forward," GM said Friday. The automaker said this is its first semiconductor-related full-size truck production downtime since August. GM noted that overall it has "seen better consistency in semiconductor supply through the first quarter compared to last year as a whole. This has translated into improvement in our production and deliveries during the first three months of the year." GM Chief Executive Officer Mary Barra met with some lawmakers on Capitol Hill this week, including Republican Senator Todd Young of Indiana. GM is backing a bill in Congress to provide $52 billion in government subsidies to boost U.S. semiconductor manufacturing. GM said that legislation could help "alleviate the ongoing shortage that continues to impact U.S. automotive manufacturing." (Reporting by David Shepardson; editing by Jonathan Oatis) Related video:
2022 Chevrolet Silverado and GMC Sierra now cost more, again
Thu, May 26 2022GM Authority put Chevrolet and GMC pickup truck prices under the microscope, spying the same macroscopic issues none of us can avoid seeing: Price increases. The 2022 Chevy Silverado 1500 and 2022 GMC Sierra 1500 have been hit with their third price increases this year. The Heavy Duty versions of those same trucks have been given their fourth price increases this year. Starting with the light-duty options, they've been rung up for another $900 across the board, which breaks down to $800 added to the MSRP and $100 added to the destination charge. The mandatory cost for shipping a truck from the factory to the dealer is now $1,795. That destination fee is now more than 5% of the purchase price of the least expensive 2022 Silverado, the Regular Cab Work Truck trim with a Standard Bed and 2.7-liter turbocharged four-cylinder retailing for $36,395 after destination. And that price is $3,200 more than the initial list price from last December. At the other end, the Silverado ZR2 is up $3,400. Average that out, and the Silverado's MSRP has gone up by nearly $700 every month since initial pricing came out. On the GMC side, the bidding starts at $37,195 for the Regular Cab Pro trim with a Standard Bed, a $4,700 increase over pricing announced last October. Stepping up a tow rating or two, the Silverado HD is now $1,100 more expensive — $1,000 tacked onto the MSRP, the destination charge plumped another $100 to $1,795. The Silvy 2500 HD now starts at $41,295. The Sierra HD turns the screw a few more degrees, going up by $2,100 after the $100 increase for destination. The low bar for the Sierra 2500 HD is $41,995, a $4,100 rise over the price when it hit dealer lots last summer. Whew. Anyone know where the exit is for this "new normal?" Related video:
GM to sink over $900M into 4 plants, mostly for a new V8
Fri, Jan 20 2023FLINT, Mich. — General Motors says it will spend more than $900 million to update four factories, with the bulk going to an engine plant in Flint, Michigan, to build the next-generation V8 for big pickup trucks and SUVs. Factories in Rochester, New York; Defiance, Ohio; and Bay City, Michigan, also will see investments, some to make V8 engine components as well as parts for future electric vehicles, the company said Friday. The investments won't create any new jobs, but they will preserve about 2,400 hourly and salaried positions positions at the four sites, the company said. The investments “provide job security at these plants for years to come,” Gerald Johnson, GM's manufacturing chief, said in a statement. Much of the money, $579 million, will go to Flint Engine Operations for equipment to build the sixth-generation small-block V8 that will go into the next round of big pickup trucks and SUVs. The plant now employs about 700 people who also will keep making their current product, a diesel engine used in light trucks. GM, like other automakers, is facing stricter government fuel economy standards and pollution limits starting in the 2024 model year. New vehicles sold in the U.S. will have to average at least 40 miles per gallon of gasoline in 2026, up from about 28 mpg, under new Biden administration rules that undo a rollback of standards enacted under former President Donald Trump. That means the new V8 will have to get better mileage and pollute less than the current versions. Although GM wouldn't release details on the new engine, Johnson said during a news conference at the Flint plant that it would be more efficient than the current version. GM has a goal of selling only electric passenger vehicles by 2035, but Johnson said that's a dozen years out, a period when many customers will still want gas engines. “We know that has a horizon,” he said. “Between here and there, there are a lot of internal combustion customers that we don't want to lose,” he said. In addition to Flint, GM's engine components plant in Bay City, Michigan, will get $216 million to build camshafts and connecting rods, and to machine engine blocks and heads for the new V8 being built in Flint. The plant now employs about 425. The Defiance, Ohio, foundry will get $55 million to build a variety of block castings for the new V8. Included is $8 million for castings to support future electric vehicles, the company said. The plant has about 530 employees.




















