We Finance!! 2010 Chevrolet Camaro Ss 2ss 6-speed Brembo Xenon Boston 1k Miles on 2040-cars
Webster, Texas, United States
For Sale By:Dealer
Engine:6.2L 376Cu. In. V8 GAS OHV Naturally Aspirated
Body Type:Coupe
Transmission:Manual
Fuel Type:GAS
Warranty: Vehicle has an existing warranty
Make: Chevrolet
Model: Camaro
Trim: SS Coupe 2-Door
Disability Equipped: No
Doors: 2
Drive Type: RWD
Drive Train: Rear Wheel Drive
Mileage: 1,302
Inspection: Vehicle has been inspected
Sub Model: 6 SPD 2 SS
Number of Doors: 2
Exterior Color: Black
Interior Color: Black
Number of Cylinders: 8
Cab Type (For Trucks Only): Other
Chevrolet Camaro for Sale
1968 camaro ss / rs special ordered car loaded with rare options british green
We finance! 2010 chevrolet camaro ss 2ss 6-speed roof heated seats brembo 11k mi(US $30,588.00)
Rolling chassis 1992 rs camaro 4 inch cowl hood drag car
2010 chevrolet camaro ss coupe 2-door 6.2l(US $31,000.00)
2012 chevy camaro rs leather sunroof boston acoustics stereo 20" wheels(US $26,988.00)
We finance!! 2010 chevrolet camaro ss 6-speed 2ss heated seats brembo 20 rims xm(US $26,998.00)
Auto Services in Texas
Whatley Motors ★★★★★
Westside Chevrolet ★★★★★
Westpark Auto ★★★★★
WE BUY CARS ★★★★★
Waco Hyundai ★★★★★
Victorymotorcars ★★★★★
Auto blog
2020 Chevy Silverado, GMC Sierra recalled due to faulty brake component
Wed, Mar 11 2020General Motors is recalling 2020 Chevrolet Silverado 1500 and GMC Sierra 1500 pickups to fix a defect in the trucks' brake system. Certain Silverado and Sierra pickups were produced with brake-caliper bolts that were not heat-treated. Without heat-treating, the bolts are weaker than they should be, and there is a risk that they could fail, which would affect the trucks' braking performance, possibly leading to a crash. In total, 20,352 vehicles are affected. Owners of affected trucks will be contacted by GM. Dealers will inspect the bolts and replace those that are defective. Related Video: Â Â Â
GM's labor deal with UAW union on verge of ratification
Thu, Nov 16 2023Nov 15 (Reuters) - General Motors' tentative labor deal with the United Auto Workers (UAW) union closed in on ratification as the votes were counted on Wednesday. Following the approval earlier in the day by more than 60% of union members at the Detroit automaker's large Arlington, Texas, assembly plant, additional votes in favor have the deal close to clinching majority approval. The number of union locals, most of which are smaller, still to report vote totals is not large. After several large assembly plants voted against the deal earlier on Wednesday, some media had reported the deal was heading toward failure. But Arlington's support, followed by strong voting in favor by smaller warehouse and parts facilities, has put the deal on the brink of approval. This would mark the first ratification of a deal, which runs through April 2028, with one of the Detroit Three automakers. Ford and Stellantis voting is still under way, and workers at both companies were favoring ratification by comfortable margins. The UAW's GM vote tracking site currently shows approval of the contract leading by a 54% to 46% margin with almost 32,000 workers having cast votes out of about 46,000 UAW-represented GM workers. The Arlington plant, with about 5,000 UAW members, has the most of any GM plant. Voting officially ends on Thursday at 4 p.m. EST, although most votes will be cast on Wednesday. The UAW went on strike for more than six weeks against the Detroit Three, seeking better wages, working conditions and cost-of-living adjustments. All three companies agreed to tentative agreements about two weeks ago. Workers at other GM assembly plants voted against the deal, including 60% of workers at its Fort Wayne, Indiana, truck plant, 53% at its Wentzville, Missouri, plant, 58% of workers at GM's Lansing Grand River plant and 61% of workers at the Lansing Delta Township plant. Seven of GM's 11 assembly plants rejected the deal. In addition to Arlington, workers at plants in Detroit, Fairfax, Kansas; and Lake Orion, Michigan; approved the agreement. Only nine facilities are still listed without vote totals on the UAW vote tracker, including GM's Lockport, New York, components plant with about 1,200 members. Those voting in favor of the agreement have a lead of almost 2,500 and many of the facilities still to come include workers who stand to receive large pay increases upon ratification.
GM CEO to meet with U.S. lawmakers over job cuts
Fri, Nov 30 2018WASHINGTON — General Motors Co Chief Executive Mary Barra plans to visit Capitol Hill next week to discuss the company's plans to halt production at five plants in North America next year and cut up to 15,000 jobs, two congressional aides said on Friday. GM has come under harsh criticism from lawmakers from both major political parties, and from President Donald Trump, since Monday when it announced the biggest restructuring for the U.S. No. 1 carmaker since its bankruptcy a decade ago. Barra is expected to meet with lawmakers from Michigan and Ohio, where GM plans to shutter three plants, as well as senior leaders in Congress. GM did not immediately comment. Barra has been calling lawmakers this week to explain the decision to end production. Trump has threatened to revoke subsidies for GM. The Detroit automaker plans to halt production next year at three assembly plants: the Lordstown small-car factory near Youngstown, Ohio; the Detroit-Hamtramck complex in Detroit; and the Oshawa, Ontario, assembly complex near Toronto. It will also stop building several models now assembled at those plants, including the Chevrolet Cruze, the Chevrolet Volt hybrid, the Cadillac CT6 and the Buick LaCrosse. Additionally, GM plans to shutter the Warren transmission plant outside Detroit and a plant that makes electric motors and drivetrains outside Baltimore, Maryland. The Cruze compact car will be discontinued in the U.S. market in 2019, although GM may continue building it in Mexico for other markets, Barra said. Reporting by David Shepardson. Related Video: