Chevrolet Camaro 2ss on 2040-cars
Sarasota, Florida, United States
Just moved to the big apple and sadly, I couldn't bring my Camaro with me. So I had to leave it in Florida where I go once a month and take it for a spin. The car has just 12,000 miles and has only be driven by me (anti valet parking car freak). As you can see in the description above, this beauty comes with the 2SS 45th Anniversary package which includes: Exterior: Carbon Flash Metallic with 45th Anniversary hood stripe Interior: 45th Special Edition interior in Jet Black, accented with White on the instrument panel and door inserts.
Chevrolet Camaro for Sale
Chevrolet camaro z28(US $1,000.00)
Chevrolet camaro base hardtop 2-door(US $14,000.00)
1967 - chevrolet camaro(US $7,000.00)
Chevrolet camaro base hardtop 2-door(US $14,000.00)
Chevrolet camaro zl550 #11 of 250(US $12,000.00)
Chevrolet camaro rs(US $14,000.00)
Auto Services in Florida
Zeigler Transmissions ★★★★★
Youngs Auto Rep Air ★★★★★
Wright Doug ★★★★★
Whitestone Auto Sales ★★★★★
Wales Garage Corp. ★★★★★
Valvoline Instant Oil Change ★★★★★
Auto blog
GM follows Ford and Honda in skipping SEMA
Fri, May 20 2022The list of automakers skipping SEMA has become longer. First reported by Muscle Cars and Trucks, and confirmed to us by a company representative, General Motors will not have an official presence at the aftermarket show. It joins Ford and Honda in leaving the show. It will be a large hole in the show, with the GM brands typically filling a significant swath of available show space in one of the main halls. GM hasn't provided much explanation for the move, either. The GM representative provided Autoblog with the same statement that Muscle Cars and Trucks got: "GM has made the decision not to participate in the 2022 SEMA Show. The SEMA show has always inspired us, and accessories and performance parts remain an important part of our business." We also asked if we would see any sort of announcements around the time of the show — Ford said it has plans to share some things around that time — however, the GM representative said that the company has no immediate plans for announcements. Certainly things could change between now and the November show, though. SEMA had previously noted that other exhibitors would help fill in some of the space vacated by these major OEMs. Another OEM, Volkswagen, is returning to the show after an absence, which will also help with the display deficit. Related Video:
GM ending stop-sale order on heavy-duty trucks
Tue, Apr 26 2022General Motors responded to an inquiry from Autoblog regarding a stop-sale order on its full-size heavy-duty pickup trucks. Here's GM's official statement. GM is committed to building the highest quality products possible. We paused delivery on a small number of HD pickups with the 6.6 liter Duramax engine last week to finalize an investigation into a potential quality issue. The investigation has been completed and the stop sale will be lifted for the small number of vehicles at dealerships.Customers can be assured GM’s heavy duty pickups are covered by a 5 year/100,000 mile powertrain warranty. The original article continues below. General Motors has reportedly sent its Chevrolet and GMC dealers a stop-sale order that applies to some examples of the 2022 Silverado HD, the 2022 Silverado MD, and the 2022 Sierra HD. The units affected by the stop-sale order may develop an engine-related problem. Citing anonymous sources, website GM Authority wrote that the Duramax 6.6-liter turbodiesel V8 in the affected trucks can hydrolock, which means liquid could enter the cylinders and cause a substantial amount of damage. The report does not specify where the liquid would come from; hydrolocking can happen by driving through a deep puddle of water, for example, but a large amount of coolant can cause it as well. The publication adds that the stop-sale order was assigned internal reference number N222362910. It also notes that the trucks included in it can't be sold, delivered to buyers, traded with another dealer, sent to auction, or even used for demonstration purposes until further notice. Earlier in April 2022, GM Authority reported that General Motors planned to buy back an unspecified number of Silverado HD and Sierra HD trucks due to quality-related issues with the 6.6-liter V8. Details about the problems experienced by customers haven't been released; all we know is that each truck will be replaced, though the replacement may not have the same equipment due to the ongoing chip shortage. Related video:
GM adds 1,200 jobs at Detroit-Hamtramck plant
Thu, Oct 22 2015General Motors is making a big move at its Hamtramck, MI, factory, announcing it will add a second shift and hire over 1,200 workers within the next several months. It's expected that by early 2016, the factory will employ over 2,800 workers to build the Chevrolet Volt, Impala, Malibu, Cadillac ELR, and by early next year, the new CT6. According to GM Hamtramck spokesperson Courtney Zemke, 40 of the 1,200 positions are for salaried employees, while the remainder will be hourly positions. As for where these employees will go, positions are being made available across the factory, so GM isn't focusing on any particular area for its new hires. It's a similar story behind the hiring surge itself. GM said in its press release that the "second shift is necessary to meet forecasted market demand," a position Zemke reiterated. It's a matter of demand across the plant's portfolio, rather than any one particular product seriously outstripping supply. Naturally, the United Auto Workers is happy with the move. "The workforce at Detroit-Hamtramck is second to none," UAW Local 22 Shop Chairman Don LaForest said in the attached release. "We appreciate the opportunity to expand our UAW-GM family." Hiring is going on now, with the second shift slated to get underway in early 2016. GM's Detroit-Hamtramck Assembly to Add Second Shift and More Than 1,200 Jobs Plant will nearly double its workforce by early 2016 2015-10-22 DETROIT – General Motors is nearly doubling its workforce at Detroit-Hamtramck Assembly by adding a second shift and more than 1,200 hourly and salaried jobs. The addition of a second shift will increase the plant's workforce to approximately 2,800 people when hiring is completed. The second shift is necessary to meet forecasted market demand for the five cars produced at Detroit-Hamtramck. "This is the result of the award-winning vehicles Detroit-Hamtramck produces and the confidence GM has in our team to build world-class quality for our customers," said Plant Manager Gary West. Second shift hiring is underway, and the shift is scheduled to begin operations in early 2016. "The workforce at Detroit-Hamtramck is second to none," said UAW Local 22 Shop Chairman Don LaForest. "We appreciate the opportunity to expand our UAW-GM family." The 4.1 million-square-foot Detroit-Hamtramck Assembly opened in 1985. GM has invested $1 billion in the plant over the last six years, making it one of the company's most-agile manufacturing facilities in North America.
