Find or Sell Used Cars, Trucks, and SUVs in USA

Super Restored 1971 Chevy C10 C/k Cheyenne Fleetside 350/350 Ps Pdb 12bolt Clean on 2040-cars

Year:1971 Mileage:457 Color: Blue and White /
 Gray
Location:

Tracy, California, United States

Tracy, California, United States
Transmission:Automatic
Body Type:Pickup Truck
Engine:350 Cubic Inch
Vehicle Title:Clear
Fuel Type:Gasoline
For Sale By:Private Seller
Year: 1971
Number of Cylinders: 8
Make: Chevrolet
Model: C-10
Trim: Fleetside
Cab Type (For Trucks Only): Regular Cab
Warranty: Vehicle does NOT have an existing warranty
Drive Type: RWD
Mileage: 457
Exterior Color: Blue and White
Interior Color: Gray
Disability Equipped: No
Condition: Used: A vehicle is considered used if it has been registered and issued a title. Used vehicles have had at least one previous owner. The condition of the exterior, interior and engine can vary depending on the vehicle's history. See the seller's listing for full details and description of any imperfections. ... 

Auto Services in California

Yuki Import Service ★★★★★

Auto Repair & Service, New Car Dealers, Brake Repair
Address: 2233 Corinth Ave, Universal-City
Phone: (310) 914-1601

Your Car Specialists ★★★★★

Auto Repair & Service, Automobile Parts & Supplies, Auto Transmission
Address: 13903 Marquardt Ave, Compton
Phone: (562) 802-1332

Xpress Auto Service ★★★★★

Auto Repair & Service
Address: 14834 Valley Blvd, Bell
Phone: (626) 820-0267

Xpress Auto Leasing & Sales ★★★★★

New Car Dealers, Automobile Leasing
Address: 701 E Colorado St, South-El-Monte
Phone: (818) 500-9933

Wynns Motors ★★★★★

Auto Repair & Service, New Car Dealers, Brake Repair
Address: 55 Oak St, Brisbane
Phone: (415) 626-6936

Wright & Knight Service Center ★★★★★

Auto Repair & Service, Automobile Parts & Supplies, Auto Engine Rebuilding
Address: 566 E St, Imperial
Phone: (760) 344-3370

Auto blog

GM cutting production at two plants

Thu, Feb 26 2015

General Motors is continuing to adjust to excess supply of some of its brands' models. To get production more in line with the vehicles' actual demand, the automotive giant is idling two of its factories in North America in the coming months. The Orion Assembly plant is going to be down from March 9-13, according to an anonymous plant worker and another insider speaking to Automotive News. The factory builds the Chevrolet Sonic and Buick Verano, but there are plenty of both models sitting on dealer lots, including 216 days worth of Sonics, according to AN. The factory already had two idle periods announced to reduce the excess. In addition, downtime is scheduled at GM's "Flex" line at the Oshawa, Ontario, Canada, plant from April 13-17. This affects supply of the Chevrolet Camaro, Impala, Buick Regal and Cadillac XTS. Among them, the automotive giant has the largest supply of Regals ready for dealers with 213 days worth of them, according to AN. The future for the whole Oshawa factory is cloudy in general, though. There are rumors that it could close entirely in the future because the Camaro is leaving and the Regal and XTS might not last much longer than 2017. The Canadian government and the labor union there intend to put up a fight, though. News Source: Automotive News - sub. req.Image Credit: Bill Pugliano / Getty Images Plants/Manufacturing Buick Cadillac Chevrolet GM orion assembly oshawa plant idle

LG Chem's troubled Chevy Volt battery plant hiring once again

Thu, Sep 25 2014

The Michigan battery plant known for paying its workers to do nothing has turned things around and is now hiring more workers, specifically to do something. South Korea-based LG Chem, which runs the factory to supply the Chevrolet Volt extended-range plug-in vehicle with its lithium-ion batteries, held a job fair recently to bring on 40 new employees in order to meet higher battery demand, according to WZZM, the ABC affiliate for Grand Rapids, MI. The LG Chem factory is in Holland, MI, about 30 miles west of Grand Rapids, and it made its first batteries last year. Prior to that, though, the factory gained notoriety after a US Department of Energy (DOE) probe found that workers there were getting paid to do, well, nothing. That's because demand for the battery packs was so low that it cost less for the plant to sit idle. The DOE was conducting the probe because of its financial grant to LG Chem. But that was then and today is today. LG Chem is looking to ramp up production in advance of the second-generation Volt. That 2016 model-year version is said to have a longer all-electric range and better performance and will ride on a new chassis, but few official details have surfaced. We will know more when we get our first look at the car at the Detroit Auto Show in January.

GM adds 1,200 jobs at Detroit-Hamtramck plant

Thu, Oct 22 2015

General Motors is making a big move at its Hamtramck, MI, factory, announcing it will add a second shift and hire over 1,200 workers within the next several months. It's expected that by early 2016, the factory will employ over 2,800 workers to build the Chevrolet Volt, Impala, Malibu, Cadillac ELR, and by early next year, the new CT6. According to GM Hamtramck spokesperson Courtney Zemke, 40 of the 1,200 positions are for salaried employees, while the remainder will be hourly positions. As for where these employees will go, positions are being made available across the factory, so GM isn't focusing on any particular area for its new hires. It's a similar story behind the hiring surge itself. GM said in its press release that the "second shift is necessary to meet forecasted market demand," a position Zemke reiterated. It's a matter of demand across the plant's portfolio, rather than any one particular product seriously outstripping supply. Naturally, the United Auto Workers is happy with the move. "The workforce at Detroit-Hamtramck is second to none," UAW Local 22 Shop Chairman Don LaForest said in the attached release. "We appreciate the opportunity to expand our UAW-GM family." Hiring is going on now, with the second shift slated to get underway in early 2016. GM's Detroit-Hamtramck Assembly to Add Second Shift and More Than 1,200 Jobs Plant will nearly double its workforce by early 2016 2015-10-22 DETROIT – General Motors is nearly doubling its workforce at Detroit-Hamtramck Assembly by adding a second shift and more than 1,200 hourly and salaried jobs. The addition of a second shift will increase the plant's workforce to approximately 2,800 people when hiring is completed. The second shift is necessary to meet forecasted market demand for the five cars produced at Detroit-Hamtramck. "This is the result of the award-winning vehicles Detroit-Hamtramck produces and the confidence GM has in our team to build world-class quality for our customers," said Plant Manager Gary West. Second shift hiring is underway, and the shift is scheduled to begin operations in early 2016. "The workforce at Detroit-Hamtramck is second to none," said UAW Local 22 Shop Chairman Don LaForest. "We appreciate the opportunity to expand our UAW-GM family." The 4.1 million-square-foot Detroit-Hamtramck Assembly opened in 1985. GM has invested $1 billion in the plant over the last six years, making it one of the company's most-agile manufacturing facilities in North America.