1971 Chevy C-10 4x4 Step Side on 2040-cars
Woodbury, Connecticut, United States
Engine:350
Drive Type: 4x4 auto
Make: Chevrolet
Mileage: 100,000
Model: C-10
Trim: Step side
Options: 4-Wheel Drive
Here is your chance to get a super rare truck that runs, drives, stops and looks great! The truck is a driver and is not perfect but could easily be a show truck. the floor boards are rusty but not gone, the front drive shaft is out abd needs to be extended to to the lift. The 350 has been converted to electronic ignition and has a new Holey carburetor. I just drove the truck 50 miles on the highway last night and would have keep going all night with pleaser. Happy bidding and good luck.
Chevrolet C-10 for Sale
1964 chevy c10 longbed stepside
1966 chevy short bed fleetside v8 auto p/s disc brakes muscle hotrod apache 3100(US $15,000.00)
1972 chevy c-10 a/c 350 auto power steering power disc brakes **nice**
1968 c10 truck shortbed
1965 chevrolet c-10 stepside truck ~ frame off resto ~ chevy ~make me an offer~(US $19,995.00)
1967 chevrolet c10 swb pickup 283 3 speed ps bench seat check this out(US $10,999.00)
Auto Services in Connecticut
White Plains Nissan ★★★★★
Tires Plus Brakes LLC ★★★★★
Ron`s Sales & Service Center ★★★★★
Parker Street Used Auto Parts Inc ★★★★★
O`Malley`s Truck & Auto Body ★★★★★
Mercedes-Benz of Fairfield ★★★★★
Auto blog
Chevy Bolt 200-mile EV going into production near Detroit
Thu, Feb 12 2015Where there's smoke, there's fire, apparently. The rumors of the Chevy Bolt going into production have been proven correct, with an announcement this morning at the Chicago Auto Show that the 200-mile, all-electric Bolt will be built at the Orion Assembly facility near Detroit. GM didn't say exactly when the Bolt will be built, but GM North America president Alan Batey said in a statement that, "We are moving quickly because of its potential to completely shake up the status quo for electric vehicles." He's not kidding. GM is talking about a $30,000 price tag for an EV that can do twice as many electric miles as any non-Tesla mass-production EV today. Previous hints have the Bolt starting production next year for a market debut in 2017, and with all of the accuracy we've seen from these secret releases up to now, we're going to say this is probably accurate until we hear otherwise. We still have questions about the price tag, but for now we'll try to track down more information here in Chicago. Chevrolet Commits to Bolt EV Production Game-changing, long-range EV to be built at Orion Assembly facility in Michigan CHICAGO – Chevrolet this morning confirmed production of its next-generation pure electric vehicle, based on the Bolt EV concept. It will be built at General Motors' Orion Assembly facility near Detroit. GM North America President Alan Batey made the announcement ahead of the Chicago Auto Show. The Bolt EV concept was introduced last month at the North American International Auto Show in Detroit. "The message from consumers about the Bolt EV concept was clear and unequivocal: Build it," said Batey. "We are moving quickly because of its potential to completely shake up the status quo for electric vehicles." Leveraging the industry-leading battery technology found in the Chevrolet Volt and Spark EV, the Bolt EV concept was developed as a game-changing, long-range pure electric for all 50 states, designed to offer more than a GM-estimated 200 miles of range at a target price of around $30,000. The progressively styled concept vehicle features selectable driving modes for preferred driving styles, such as daily commuting, and it was designed to support DC fast charging. "We're proud that Chevrolet has decided to produce the Bolt EV here in Michigan at the Orion Assembly facility," Gov. Rick Snyder said. "Michigan unquestionably remains the global automotive leader.
GM cutting production at two plants
Thu, Feb 26 2015General Motors is continuing to adjust to excess supply of some of its brands' models. To get production more in line with the vehicles' actual demand, the automotive giant is idling two of its factories in North America in the coming months. The Orion Assembly plant is going to be down from March 9-13, according to an anonymous plant worker and another insider speaking to Automotive News. The factory builds the Chevrolet Sonic and Buick Verano, but there are plenty of both models sitting on dealer lots, including 216 days worth of Sonics, according to AN. The factory already had two idle periods announced to reduce the excess. In addition, downtime is scheduled at GM's "Flex" line at the Oshawa, Ontario, Canada, plant from April 13-17. This affects supply of the Chevrolet Camaro, Impala, Buick Regal and Cadillac XTS. Among them, the automotive giant has the largest supply of Regals ready for dealers with 213 days worth of them, according to AN. The future for the whole Oshawa factory is cloudy in general, though. There are rumors that it could close entirely in the future because the Camaro is leaving and the Regal and XTS might not last much longer than 2017. The Canadian government and the labor union there intend to put up a fight, though. News Source: Automotive News - sub. req.Image Credit: Bill Pugliano / Getty Images Plants/Manufacturing Buick Cadillac Chevrolet GM orion assembly oshawa plant idle
Fernando Alonso sputters in his Indy test
Thu, Apr 25 2019INDIANAPOLIS — Helio Castroneves and Fernando Alonso kept waiting around Wednesday. Now both international stars have some unfinished business to take care before qualifying for this year's Indianapolis 500. After enduring a rain delay of more than four hours then watching IndyCar regulars turn laps at Indianapolis Motor Speedway for two more hours, Castroneves and Alonso finally made it onto the track — but couldn't quite complete their refresher course. "Happy to be back here because this place is great," Alonso said after posting a fast lap of 218.690 mph — the slowest of the nine-driver evening session. "We were slow because the weather and some of the decisions people made on running time and things like that." He faced a bevy of problems in his first trip back to Indy since an impressive rookie performance in 2017. The rain delay forced organizers into rescheduling the one-day test, moving the rookie and refresher driver time from midday to the evening, cutting a significant amount of practice time for Alonso and the others. And when the green flag finally waved, Alonso's No. 66 car stalled in the warmup lane forcing the two-time Formula One champion from Spain to be towed back to pit lane where his crew worked feverishly to fix an electrical problem while sat in the cockpit. Eventually, he did get out and passed the first of two refresher phases. He'll have to wait until opening practice of the 500 on May 14 to pass the second. "It was frustrating for everyone because it was a brand new chassis and a brand new car, so we expected to run a lot," said Alonso, who drives for McLaren Racing. "If we could have had this at midday, you could work on your issues in the afternoon and then go out again." To put his day in perspective, Takuma Sato, the 2017 Indy winner from Japan, posted the fastest lap of the day at 226.993 mph and Colton Herta was the fastest rookie at 226.108. Castroneves, as usual, was good right from the start and posted a fast lap of 225.565. The three-time Indianapolis 500 winner looked smooth and fast on his favorite track and wasted no time passing the first phase. That much should have been expected from the popular Brazilian, who has recorded seven top-three finishes in 18 Indy starts and will make his season debut May 11 in the IndyCar Grand Prix. The weather and yellow flags prevented four of the five veterans — Castroneves, Alonso, Oriol Servia and JR Hildebrand — from passing phase two. Only Indy native Conor Daly made it.




















