1955 Cadillac Fleetwood on 2040-cars
Scottsdale, Arizona, United States
Transmission:Automatic
Fuel Type:Gasoline
For Sale By:Dealer
Vehicle Title:Clean
Engine:331ci V8
VIN (Vehicle Identification Number): 556018481
Mileage: 84150
Sub Model: Series 60 Special
Interior Color: White
Warranty: Vehicle does NOT have an existing warranty
Number of Cylinders: 8
Make: Cadillac
Drive Type: 2WD
Doors: 4
Model: Fleetwood
Exterior Color: Pink
Car Type: Classic Cars
Number of Doors: 4
VIN: 556018481 Power Options: Air conditioning, Power windows, Power seats
Cylinders: 8-Cyl.
Auto Services in Arizona
Xtreme Roadside ★★★★★
Xpress Automotive & Wash ★★★★★
Windshield Replacement & Auto Glass Repair Phoenix ★★★★★
West Glenn Body Shop ★★★★★
Valley Express Auto Repair ★★★★★
Valley Express Auto Repair ★★★★★
Auto blog
Is this the 2014-15 Cadillac Escalade?
Fri, 19 Apr 2013Following the introduction of the redesigned Chevrolet Silverado and GMC Sierra, we're expecting General Motors won't wait too much longer to show off the next-generation fullsize SUVs that share this platform - including the Cadillac Escalade. It's still not clear if the next Escalade will debut for the 2014 or 2015 model years, but Carscoops has what it claims to an exclusive first look of the new Cadillac, revealing a portion of the headlight, front fascia and wheel.
Judging from this small picture, it looks like the Escalade could incorporate styling cues that we've seen on new Cadillac models like the ELR and the 2014 CTS, but that article says that other design details could include tall, vertical taillights similar to the CTS Wagon, staggered-width wheels and a narrower daylight opening for the side windows. The last time we saw the fourth-generation 'Slade back in October in spy shots, the heavy camouflage prevented us from getting an idea of the luxury SUV's appearance, but this image and description gives us something to look forward to. Head on over to Carscoops for more potential information as well as a full rendering from back in January.
GM adds 1,200 jobs at Detroit-Hamtramck plant
Thu, Oct 22 2015General Motors is making a big move at its Hamtramck, MI, factory, announcing it will add a second shift and hire over 1,200 workers within the next several months. It's expected that by early 2016, the factory will employ over 2,800 workers to build the Chevrolet Volt, Impala, Malibu, Cadillac ELR, and by early next year, the new CT6. According to GM Hamtramck spokesperson Courtney Zemke, 40 of the 1,200 positions are for salaried employees, while the remainder will be hourly positions. As for where these employees will go, positions are being made available across the factory, so GM isn't focusing on any particular area for its new hires. It's a similar story behind the hiring surge itself. GM said in its press release that the "second shift is necessary to meet forecasted market demand," a position Zemke reiterated. It's a matter of demand across the plant's portfolio, rather than any one particular product seriously outstripping supply. Naturally, the United Auto Workers is happy with the move. "The workforce at Detroit-Hamtramck is second to none," UAW Local 22 Shop Chairman Don LaForest said in the attached release. "We appreciate the opportunity to expand our UAW-GM family." Hiring is going on now, with the second shift slated to get underway in early 2016. GM's Detroit-Hamtramck Assembly to Add Second Shift and More Than 1,200 Jobs Plant will nearly double its workforce by early 2016 2015-10-22 DETROIT – General Motors is nearly doubling its workforce at Detroit-Hamtramck Assembly by adding a second shift and more than 1,200 hourly and salaried jobs. The addition of a second shift will increase the plant's workforce to approximately 2,800 people when hiring is completed. The second shift is necessary to meet forecasted market demand for the five cars produced at Detroit-Hamtramck. "This is the result of the award-winning vehicles Detroit-Hamtramck produces and the confidence GM has in our team to build world-class quality for our customers," said Plant Manager Gary West. Second shift hiring is underway, and the shift is scheduled to begin operations in early 2016. "The workforce at Detroit-Hamtramck is second to none," said UAW Local 22 Shop Chairman Don LaForest. "We appreciate the opportunity to expand our UAW-GM family." The 4.1 million-square-foot Detroit-Hamtramck Assembly opened in 1985. GM has invested $1 billion in the plant over the last six years, making it one of the company's most-agile manufacturing facilities in North America.
2016 Cadillac ATS-V brandishes 450 horses and 6-speed manual
Tue, 11 Nov 2014Details about the hotly anticipated 2016 Cadillac ATS-V are tumbling out, and they look to be everything we could ask for in a high-performance Caddy coupe.
According to Road & Track, the ATS-V will use a version of the twin-turbocharged 3.6-liter V6 from the CTS Vsport, but the wick will be turned up to 450 horsepower and 445 pound-feet of torque. In glorious news for driving enthusiasts everywhere, that potent mill will be available with either a six-speed manual or eight-speed automatic.
According to R&T, the engine has a heap of high-performance tech to let it make the extra ponies, including titanium connecting rods, two water-to-air intercoolers, titanium turbines for the turbos and an additional radiator dedicated to cooling the gearbox and electronically locking differential. Keeping it all planted are a set of Michelin Pilot Super Sport tires, and a suspension with 50 percent more roll stiffness.















