2010 Cadillac Escalade Platinum Awd Sunroof Nav Dvd 19k Texas Direct Auto on 2040-cars
Stafford, Texas, United States
Cadillac Escalade for Sale
2000 cadillac escalade 4x4(US $3,995.00)
2007 cadillac escalade base sport utility 4-door 6.2l(US $22,000.00)
Cadillac escalade. 2006(US $14,000.00)
2010 cadillac escalade platinum hybrid sunroof nav 22's texas direct auto(US $34,980.00)
2009 cadillac escalade ultra sunroof nav rear cam 52k texas direct auto(US $35,980.00)
2007 cadillac escalade, 2wd suv, 79,000m: fully loaded, xxf
Auto Services in Texas
Yescas Brothers Auto Sales ★★★★★
Whitney Motor Cars ★★★★★
Two-Day Auto Painting & Body Shop ★★★★★
Transmission Masters ★★★★★
Top Cash for Cars & Trucks : Running or Not ★★★★★
Tommy`s Auto Service ★★★★★
Auto blog
President Trump might get to start his administration in a new Cadillac limo [UPDATE]
Fri, Jan 13 2017(UPDATE: Jalopnik is reporting an unidentified source claimed the new limo would not be featured in today's inauguration ceremony. The source did say however that the limo would join the presidential fleet later this year.) A rumor is going around that President-Elect Donald Trump will have a brand new set of wheels the day he takes office. The Cadillac Presidential Limousine, nicknamed "The Beast," was last refreshed in 2009 and led President Barack Obama's second inauguration-day parade. Cadillac could not confirm any timeline for the new presidential limo, nor could it confirm any specifics about the car nicknamed Beast 2.0. That's as expected, because details on the presidential limo are closely guarded and considered matters of national security. The outgoing original "Beast" limo marked a switch to a custom-built vehicle based on a General Motors truck frame. Previous limos were based on the actual cars they looked like. As we've seen in spy shots, The Beast 2.0 limo looks more like an Escalade SUV or CT6 sedan but is reported to be roughly the same size and shape as the old Beast, which is built on a Chevrolet Kodiak/GMC TopKick medium-duty truck chassis. AutoWeek is reporting that the new limo is set to debut for Trump's inauguration, however those reports could not be confirmed for the reasons mentioned above. The new Presidential car is expected to accommodate seven passengers in conference-style seating in the back like the current version. The Beast isn't meant for road trips, as it is mostly used to ferry the President to and from Air Force One when traveling, or on short trips around Washington D.C. That's good, considering the current limo only gets 3.7 miles per gallon. Along with multiple screens for video conferencing, The next Beast will also definitely include advanced armoring and weaponry. For security reasons, it's impossible to know the extent of those systems, but any vehicle transporting the most powerful man in the world around has to be tough. The entire process of designing and building the Presidential limo is top secret, as the Secret Service figures the less everyone knows about the Presidential Limo, the better. The new Beast, we can safely assume, is likely the safest vehicle in the world. The Secret Service began taking bids on building a replacement in 2014 because integrating all of the required armor is technically challenging.
GM pauses 3.0-liter turbodiesel production due to a supplier shortage
Mon, Aug 30 2021General Motors confirmed it has temporarily stopped taking orders for trucks and SUVs equipped with the 3.0-liter Duramax turbodiesel six-cylinder engine. It blamed the last-minute pause on a supplier-related shortage. Website TFL Truck first reported the news, and a representative from General Motors quickly confirmed it. The spokesperson explained the issue is due to a "temporary part shortage" and added that production will resume "as soon as possible," meaning the Duramax engine (which is called LM2 internally) is not going away permanently. Additional details are not available, so we don't know if the issue is related to the ongoing chip shortage. Rather than delay deliveries and create a backlog, General Motors is reportedly asking its dealers to encourage buyers who want a turbodiesel engine to instead select either the 5.3-liter V8 or the 6.2-liter V8, depending on the model selected. Both are gasoline-powered units. There's no word yet on when Duramax production will resume. The shortage affects several models, including Chevrolet's Tahoe, Suburban, and Silverado 1500 and GMC's variants of these trucks. Cadillac's Escalade is temporarily diesel-less as well. Heavy Duty variants of the Silverado and the Sierra are not affected because they're powered by a different Duramax engine with eight cylinders. Motorists seeking a full-size SUV powered by an efficient turbodiesel engine are temporarily out of options because the Tahoe/Yukon and the Suburban/Yukon XL had the segment to themselves. The Duramax was surprisingly popular, too: in May 2021, GM Authority reported that the turbodiesel straight-six represented 8% of Suburban sales and 6% of Tahoe sales. Installed in a rear-wheel-drive Tahoe, the engine returns 21 mpg in the city, 28 mpg on the highway, and 24 mpg in a combined cycle, figures that make the body-on-frame behemoth more efficient than the unibody, front-wheel-drive Chevrolet Blazer that's 20 inches shorter and approximately 1,700 pounds lighter. Related video: 2021 Chevrolet Tahoe 3.0L Duramax engine
GM's labor deal with UAW union on verge of ratification
Thu, Nov 16 2023Nov 15 (Reuters) - General Motors' tentative labor deal with the United Auto Workers (UAW) union closed in on ratification as the votes were counted on Wednesday. Following the approval earlier in the day by more than 60% of union members at the Detroit automaker's large Arlington, Texas, assembly plant, additional votes in favor have the deal close to clinching majority approval. The number of union locals, most of which are smaller, still to report vote totals is not large. After several large assembly plants voted against the deal earlier on Wednesday, some media had reported the deal was heading toward failure. But Arlington's support, followed by strong voting in favor by smaller warehouse and parts facilities, has put the deal on the brink of approval. This would mark the first ratification of a deal, which runs through April 2028, with one of the Detroit Three automakers. Ford and Stellantis voting is still under way, and workers at both companies were favoring ratification by comfortable margins. The UAW's GM vote tracking site currently shows approval of the contract leading by a 54% to 46% margin with almost 32,000 workers having cast votes out of about 46,000 UAW-represented GM workers. The Arlington plant, with about 5,000 UAW members, has the most of any GM plant. Voting officially ends on Thursday at 4 p.m. EST, although most votes will be cast on Wednesday. The UAW went on strike for more than six weeks against the Detroit Three, seeking better wages, working conditions and cost-of-living adjustments. All three companies agreed to tentative agreements about two weeks ago. Workers at other GM assembly plants voted against the deal, including 60% of workers at its Fort Wayne, Indiana, truck plant, 53% at its Wentzville, Missouri, plant, 58% of workers at GM's Lansing Grand River plant and 61% of workers at the Lansing Delta Township plant. Seven of GM's 11 assembly plants rejected the deal. In addition to Arlington, workers at plants in Detroit, Fairfax, Kansas; and Lake Orion, Michigan; approved the agreement. Only nine facilities are still listed without vote totals on the UAW vote tracker, including GM's Lockport, New York, components plant with about 1,200 members. Those voting in favor of the agreement have a lead of almost 2,500 and many of the facilities still to come include workers who stand to receive large pay increases upon ratification.











