2007 Cadillac Dts Luxury 11 Sedan 4-door 4.6l on 2040-cars
Port Orange, Florida, United States
Cadillac DTS for Sale
2006 cadillac dts luxury iii pkg. low miles loaded with options extra clean(US $9,995.00)
Limo limousine cadillac dts black 2009 low miles excellent condition luxury rare(US $50,000.00)
2003 cadillac deville dts fully loaded no reserve auction
2006 cadillac dts low miles only 32,544 leather extra clean we finance(US $15,336.00)
2007 cadillac dts base sedan 4-door 4.6l(US $5,200.00)
2006 cadillac dts performance sunroof nav xenon 53k mi texas direct auto(US $16,980.00)
Auto Services in Florida
Yesterday`s Speed & Custom ★★★★★
Wills Starter Svc ★★★★★
WestPalmTires.com ★★★★★
West Coast Wheel Alignment ★★★★★
Wagen Werks ★★★★★
Villafane Auto Body ★★★★★
Auto blog
GM recalls 55,000 trucks, SUVs for separating axles, fuel pump failures
Mon, Feb 13 2023General Motors issued four separate recalls covering eight of its truck and SUV models for issues related to fuel pump and half-shaft failure. In total, the four campaigns include more than 55,000 vehicles spread out over three brands and six model years, but they've sorted themselves neatly into two categories. Let's dive in. Axle separation Four models are being recalled for potential axle separation: The 2023 Cadillac XT5, 2023 GMC Acadia, 2023 Chevy Blazer and 2023 Chevy Traverse. The number of units affected is incredibly small (10 units each times two recalls, for a total potential population of just 20 cars). In each case, a small number left the factory with half-shaft assemblies that may have been missing the retention rings that keep them in place, possibly allowing the axles to separate or eject from the transmission. In the case of the XT5 and Acadia, it's the right-side axle assembly; Chevy dealers, however, will have to check the left side. Fuel pump failure Again, we have multiple vehicles being recalled for similar issues, but in this case they're a bit more distinct. The first of these recalls covers the 2021-2022 Chevy Equinox and 2022 GMC Terrain. GM says a supplier-initiated change may have led to fuel pumps shipping with inadequate clearances to allow for the prescribed flow of fuel, meaning the pump could starve the engine. Customers experiencing the issue may see a check engine light and experience engine hesitation. In some cases, the cars may not start at all. Chevy and GMC will replace the units in question with correctly specified pumps. The second recall covers a fairly specific cross-section of GM's HD truck lines. 2017-2019 Silverado and Sierra HD trucks sold with the diesel engine and a dual-tank configuration may have shipped with a rear fuel pump that is susceptible to fouling by debris, preventing fuel from properly transferring to the front tank, or, in extreme cases, resulting in a collapse of the rear tank. This issue can lead to inaccurate/erratic fuel tank readings, engine hesitation, a check-engine light or failure to start. In both cases, GM will inspect and replace faulty units free of charge for customers. Expect notifications to be delivered by March. Related video: Recalls Cadillac Chevrolet GMC Ownership Safety Truck SUV
GM workers in Oshawa walk out in protest of plant closure
Mon, Nov 26 2018TORONTO/MONTREAL – Canadian Prime Minister Justin Trudeau on Monday expressed his "deep disappointment" in General Motors' decision to close its Oshawa plant, a move Canadian officials only learned about on Sunday and which led workers to walk off the job on Monday. GM said the closure affects a total of 2,973 assembly line jobs. GM's total employment in Canada is 8,150 direct jobs. Workers in the Unifor trade union walked out of the Oshawa plant "in protest," ahead of a meeting with GM about the announcement, a union spokeswoman said. "I've moved my family twice for this company and they do this to me," a tearful worker told CBC TV as he left the plant. Currently, the Oshawa plant builds the Cadillac XTS and Chevy Impala sedans. Under Unifor's four-year contract signed in 2016, GM must give the union a year's notice before closing the plant. The automaker intends to close the plant in December, 2019. A 2015 study commissioned by Unifor, which represents GM employees, estimated that shutting the plant would eliminate 4,100 direct jobs and reduce Ontario's gross domestic product by C$1.1 billion. But Jerry Dias, president of Unifor, said the move amounts to a breach of the automaker's contract with its employees. "We have a collective agreement that says they're not closing any of our facilities ... so we will do anything by any means to make sure that they live up to their word," Dias said at a news conference. Dias said the contract between Unifor and the company forbids GM from closing any of its Canadian plants during the contract period, which ends in September 2020. "They are not closing our damn plant without one hell of a fight." Canadian officials promised to aid auto workers affected by the 2019 closure, part of a wider restructuring by the automaker that will cut production of slow-selling models and slash its North American workforce. "I spoke with GM (CEO) Mary Barra to express my deep disappointment in the closure," Trudeau tweeted on Monday. "We'll do everything we can to help the families affected by this news get back on their feet." GM workers have been part of the heart and soul of Oshawa for generations - and we'll do everything we can to help the families affected by this news get back on their feet. Yesterday, I spoke with @GM's Mary Barra to express my deep disappointment in the closure.
GM cutting production at two plants
Thu, Feb 26 2015General Motors is continuing to adjust to excess supply of some of its brands' models. To get production more in line with the vehicles' actual demand, the automotive giant is idling two of its factories in North America in the coming months. The Orion Assembly plant is going to be down from March 9-13, according to an anonymous plant worker and another insider speaking to Automotive News. The factory builds the Chevrolet Sonic and Buick Verano, but there are plenty of both models sitting on dealer lots, including 216 days worth of Sonics, according to AN. The factory already had two idle periods announced to reduce the excess. In addition, downtime is scheduled at GM's "Flex" line at the Oshawa, Ontario, Canada, plant from April 13-17. This affects supply of the Chevrolet Camaro, Impala, Buick Regal and Cadillac XTS. Among them, the automotive giant has the largest supply of Regals ready for dealers with 213 days worth of them, according to AN. The future for the whole Oshawa factory is cloudy in general, though. There are rumors that it could close entirely in the future because the Camaro is leaving and the Regal and XTS might not last much longer than 2017. The Canadian government and the labor union there intend to put up a fight, though. News Source: Automotive News - sub. req.Image Credit: Bill Pugliano / Getty Images Plants/Manufacturing Buick Cadillac Chevrolet GM orion assembly oshawa plant idle














