2019 Cadillac Cts on 2040-cars
Chicago, Illinois, United States
Transmission:Automatic
Fuel Type:Gasoline
For Sale By:Dealer
Vehicle Title:Rebuilt, Rebuildable & Reconstructed
Engine:2.0L Gas I4
VIN (Vehicle Identification Number): 1G6AP5SX6K0148179
Mileage: 18740
Interior Color: Black
Number of Previous Owners: 1
Number of Cylinders: 4
Make: Cadillac
Drive Type: RWD
Drive Side: Left-Hand Drive
Fuel: gasoline
Model: CTS
Exterior Color: Black
Car Type: Passenger Vehicles
Number of Doors: 4
Cadillac CTS for Sale
2012 cadillac cts(US $55,000.00)
2019 cadillac cts luxury(US $16,026.50)
2011 cadillac cts performance collection(US $2,025.00)
2008 cadillac cts(US $6,200.00)
2017 cadillac cts(US $69,500.00)
2016 cadillac cts 957hp magnuson supercharged(US $58,096.50)
Auto Services in Illinois
White Eagle Auto Body Shop ★★★★★
Tremont Car Connection ★★★★★
Toyota Of Naperville ★★★★★
Today`s Technology Auto Repair ★★★★★
Suburban Tire Auto Repair Center ★★★★★
Steve`s Tire & Service Center ★★★★★
Auto blog
2014 Cadillac ELR leases for $699 a month
Mon, Jan 20 2014Most Autoblog readers thought the $75,000 price tag on the 2014 Cadillac ELR was too high. If you can't swing the MSRP all in one go, how does a lease price of $699 a month sound? That's the amount that Cadillac is offering on the official ELR website, with some caveats, of course. First off, it appears that this lease price is for just for "current owners and lessees of all 1999 or newer GM vehicles." They will also have to pony up $4,999 at signing (all others will need $5,999). Second, the $699-a-month price is for a 39-month lease. Then, of course, "tax, title, license, dealer fees and optional equipment [are] extra" and "each dealer sets own price." Also, it appears that this lease deal is only good until the end of January. Cadillac started shipping the ELR plug-in hybrid coupe to dealers last month. There are two things to note in the fine print. The most surprising is that the payments are based on "a 2014 Cadillac ELR with an MSRP of $76,000." That's $1,000 more than the official MSRP announced in October. Then we get to the real kicker: The lease limits you to a mere 32,500 miles, which is just 833.3 miles a month. Well, 'limit' isn't the exact word, since you can certainly drive more. All you have to do is pay 25 cents per mile for each mile over 32,500. Drive the national average of 13,476 miles in a year? That comes to 43,797 miles over 39 months, which is 11,297 extra miles and an extra $2,824.25.
Which electric cars can charge at a Tesla Supercharger?
Sun, Jul 9 2023The difference between Tesla charging and non-Tesla charging. Electrify America; Tesla Tesla's advantage has long been its charging technology and Supercharger network. Now, more and more automakers are switching to Tesla's charging tech. But there are a few things non-Tesla drivers need to know about charging at a Tesla station. A lot has hit the news cycle in recent months with regard to electric car drivers and where they can and can't plug in. The key factor in all of that? Whether automakers switched to Tesla's charging standard. More car companies are shifting to Tesla's charging tech in the hopes of boosting their customers' confidence in going electric. Here's what it boils down to: If you currently drive a Tesla, you can keep charging at Tesla charging locations, which use the company's North American Charging Standard (NACS), which has long served it well. The chargers are thinner, more lightweight and easier to wrangle than other brands. If you currently drive a non-Tesla EV, you have to charge at a non-Tesla charging station like that of Electrify America or EVgo — which use the Combined Charging System (CCS) — unless you stumble upon a Tesla charger already equipped with the Magic Dock adapter. For years, CCS tech dominated EVs from everyone but Tesla. Starting next year, if you drive a non-Tesla EV (from the automakers that have announced they'll make the switch), you'll be able to charge at all Supercharger locations with an adapter. And by 2025, EVs from some automakers won't even need an adaptor. Here's how to charge up, depending on which EV you have: Ford 2021 Ford Mustang Mach-E. Tim Levin/Insider Ford was the earliest traditional automaker to team up with Tesla for its charging tech. Current Ford EV owners — those driving a Ford electric vehicle already fitted with a CCS port — will be able to use a Tesla-developed adapter to access Tesla Superchargers starting in the spring. That means that, if you own a Mustang Mach-E or Ford F-150 Lightning, you will need the adapter in order to use a Tesla station come 2024. But Ford will equip its future EVs with the NACS port starting in 2025 — eliminating the need for any adapter. Owners of new Ford EVs will be able to pull into a Supercharger station and juice up, no problem. General Motors Cadillac Lyriq. Cadillac GM will also allow its EV drivers to plug into Tesla stations.
GM shows off 'digital vehicle platform' enabling more in-car tech and OTA updates
Wed, May 22 2019It appears to have dropped the sobriquet "Global B," but General Motors' new electrical architecture has bowed in drawings and video. This is the "digital vehicle platform" GM president Mark Reuss spoke to Reuters about in 2015, saying it would move a great deal of a vehicle's computer work to the cloud and enable over-the-air updates. Reuss took the microphone for the debut, too, saying, "Our new digital vehicle platform and its eventual successors will underpin all our future innovations across a wide range of technological advancements, including EVs and expanded automated driving." The system will go into production later this year, appearing in dealerships first either on the 2020 Cadillac CT5 or the mid-engined 2020 Chevrolet Corvette. Yes, these are the same electronics cited for delaying the launch of the C8 Corvette over excessive draw, security and getting the more-than-100 computer modules to communicate seamlessly. When Car and Driver asked about that, GM replied with "No comment." Volkswagen's having the same issues with the Mk8 Golf right now, though, so GM isn't alone, and this will be the new normal among OEMs for a while. What's certifiable is that the new architecture is robust enough to handle 4.5 terabytes of data per hour, which is five times what GM's current wiring can handle. And thanks to Ethernet connections of 100 Mbps, 1 Gbs and 10 Gbs, communication within and without the vehicle happens much faster. The advances mean better screen resolutions, better battery management for hybrids and electric vehicles, the capability for over-the-air updates and "functionality upgrades throughout the lifespan of the vehicle." Cadillac's Super Cruise has already been lined up as a leading candidate for constant improvements in the driving assistance suite, a key part of GM's "vision for a world with zero crashes, zero emissions and zero congestion." And whenever GM decides to take the plunge, it will mean a 48-volt electrical system. More than 300 specialists worked on the digital platform, and security was a huge part of the task. We've already heard that GM consulted with Boeing and military contractors on how to prevent hacking. The carmaker has an internal Product Cybersecurity group that reached out to the research community, and created a "bug bounty" program to crowdsource uncovering any flaws.