Find or Sell Used Cars, Trucks, and SUVs in USA

2009 Cadillac Cts Base Sedan 4-door 3.6l on 2040-cars

US $29,900.00
Year:2009 Mileage:53876 Color: Appearance Package
Location:

Tacoma, Washington, United States

Tacoma, Washington, United States
Advertising:

This car has everything, it is the rare PREMIUM LUXURY trim level:

 

Performance:

3.6L Direct Injection V6 304hp

6 Speed Automatic

Cadillac proven AWD system

Front and rear ventilated disc brakes with sport suspension

Exterior:

Appearance Package (note the 18” alloy premium wheels, grill and chrome package)

High Intensity and Definition (HID) headlights 

Adaptive Headlights (these are the ones that turn as you turn the wheel to go around a corner)

Rainsense automatic windshield wipers (really work great)

Panoramic sunroof (sunroof/moon roof combo)

In-Car tire pressure monitoring

Heated Mirrors

Interior:

Heated and COOLED ventilated Leather seats

Bose Premium sound system

8-way adjustable dual electric front seats

Dual electric lumbar support controls

Electric adjustable steering wheel

2-driver position memory

Dual climate control

Bluetooth hands free system (allows for 5 phone pairing)

Remote start with Key-less entry and start

OnStar

Passenger airbag occupant sensing deactivation

Navigation:

Cadillac XM traffic update integration touch screen Navigation system

Complete control of Navigation and Audio systems via voice commands

Concealable Navigation and Control screen

 

 

 

 

 

 

Auto Services in Washington

Womack Auto Body Inc ★★★★★

Automobile Body Repairing & Painting, Truck Body Repair & Painting
Address: 9831 SE Powell Blvd, Vancouver
Phone: (866) 595-6470

Trusted Choice Auto Care ★★★★★

Auto Repair & Service, Brake Repair, Automobile Inspection Stations & Services
Address: 1018 Plum St SE, Lacey
Phone: (360) 628-8290

Tire Store ★★★★★

Auto Repair & Service, Tire Dealers
Address: 3817 E Sprague Ave, Marshall
Phone: (509) 535-9251

Thurston County Transmission ★★★★★

Auto Repair & Service, Auto Transmission, Automobile Inspection Stations & Services
Address: 4022 Pacific Ave SE, Tumwater
Phone: (360) 529-0294

Thunderbird Vintage ★★★★★

Auto Repair & Service, Automobile Body Repairing & Painting, Antique & Classic Cars
Address: 5236 Guide Meridian, Lummi-Island
Phone: (360) 398-2373

Taskar Garage ★★★★★

Auto Repair & Service
Address: 7501 15th Ave NW, Kingston
Phone: (206) 297-6066

Auto blog

GM adds 1,200 jobs at Detroit-Hamtramck plant

Thu, Oct 22 2015

General Motors is making a big move at its Hamtramck, MI, factory, announcing it will add a second shift and hire over 1,200 workers within the next several months. It's expected that by early 2016, the factory will employ over 2,800 workers to build the Chevrolet Volt, Impala, Malibu, Cadillac ELR, and by early next year, the new CT6. According to GM Hamtramck spokesperson Courtney Zemke, 40 of the 1,200 positions are for salaried employees, while the remainder will be hourly positions. As for where these employees will go, positions are being made available across the factory, so GM isn't focusing on any particular area for its new hires. It's a similar story behind the hiring surge itself. GM said in its press release that the "second shift is necessary to meet forecasted market demand," a position Zemke reiterated. It's a matter of demand across the plant's portfolio, rather than any one particular product seriously outstripping supply. Naturally, the United Auto Workers is happy with the move. "The workforce at Detroit-Hamtramck is second to none," UAW Local 22 Shop Chairman Don LaForest said in the attached release. "We appreciate the opportunity to expand our UAW-GM family." Hiring is going on now, with the second shift slated to get underway in early 2016. GM's Detroit-Hamtramck Assembly to Add Second Shift and More Than 1,200 Jobs Plant will nearly double its workforce by early 2016 2015-10-22 DETROIT – General Motors is nearly doubling its workforce at Detroit-Hamtramck Assembly by adding a second shift and more than 1,200 hourly and salaried jobs. The addition of a second shift will increase the plant's workforce to approximately 2,800 people when hiring is completed. The second shift is necessary to meet forecasted market demand for the five cars produced at Detroit-Hamtramck. "This is the result of the award-winning vehicles Detroit-Hamtramck produces and the confidence GM has in our team to build world-class quality for our customers," said Plant Manager Gary West. Second shift hiring is underway, and the shift is scheduled to begin operations in early 2016. "The workforce at Detroit-Hamtramck is second to none," said UAW Local 22 Shop Chairman Don LaForest. "We appreciate the opportunity to expand our UAW-GM family." The 4.1 million-square-foot Detroit-Hamtramck Assembly opened in 1985. GM has invested $1 billion in the plant over the last six years, making it one of the company's most-agile manufacturing facilities in North America.

GM laying off 510 amidst slow Cadillac, small car sales

Wed, 12 Nov 2014

General Motors is laying off about 510 workers from two factories beginning in January, and it could be months before the automaker needs some of that latent capacity to come back on line. A combination of poor sales and high dealer inventories are prompting the cutbacks, according to Automotive News.
The largest changes come at GM's Lansing Grand River plant, where the Cadillac ATS and CTS are made. An entire shift of about 350 workers is being laid off, but the automaker hopes to find positions for some of them at other nearby factories. The decision leaves just a single shift building vehicles there. According to Automotive News, the move is partially spurred by Johan de Nysschen's plan to make Cadillac a more exclusive brand.
The lost shift will likely return for production of the next-generation Chevrolet Camaro at the plant, according to the report, but GM isn't saying when that will be. A previous announcement from the Canadian Auto Workers union indicated that the Oshawa, Ontario, factory would lose the coupe in late 2015 or early 2016.

GM announces $7 billion Michigan factory investment, most going to EVs

Tue, Jan 25 2022

GM announced a $7 billion investment in Michigan manufacturing, much of which is earmarked for EV production. Four sites are included, but the key elements are a new battery cell plant in Lansing and the conversion of GM's existing Orion Township facility to expand production of the forthcoming Chevrolet Silverado EV and its GMC Sierra sibling.  GM says it is the largest investment announcement in company history and that it will create 4,000 new jobs. It also says 1,000 jobs will be retained. "We are building on the positive consumer response and reservations for our recent EV launches and debuts, including the GMC Hummer EV, Cadillac Lyriq, Chevrolet Equinox EV and Chevrolet Silverado EV," said GM CEO Mary Barra.  GM says the Orion expansion and new battery plant will support an increase in full-size electric truck production capacity to 600,000 units. This is in addition to the Factory ZERO facility in Detroit that will also be constructing the electric Silverado and Sierra.  The Orion Township factory current builds the Chevrolet Bolt EV and EUV, and will continue to do so during the plant's conversion. GM did not indicate what will happen with the Bolts once that conversion is complete or whether all will continue to be built at Orion. They do not use the Ultium vehicle architecture. GM will build other EV models at three other factories that are under construction or being converted. They are located in Spring Hill, Tennessee, Ingersoll, Ontario, and Ramos Arizpe, Mexico. GM says that it will have the ability to produce 1 million electric vehicles by 2025. The Ultium Cells Lansing facility is a $2.6 billion joint investment by GM and LG Energy Solution. GM says it alone will create 1,700 jobs once fully operational by late 2024. It will join two other GM Ultium Cells battery factories currently under construction in the United States, one in Ohio and the other in Tennessee.  Not all of the $7 billion investment will be for EVs. It also announced $510 million of the total will go toward upgrading the Lansing Delta Township Assembly to produce the next-generation Chevrolet Traverse and Buick Enclave. Money will also go to upgrading Lansing Grand River Assembly.