2006 Cadillac Cts Base Sedan 4-door 3.6l on 2040-cars
Troy, Michigan, United States
2006 Cadillac CTS 3.6L Hi-Feature sedan. Equipped with both the Luxury Package and Sport Package, including 17" wheels. Currently at 93,800 miles, but will fluctuate with daily driving. In perfect working order, with no known mechanical issues or interior/exterior cosmetic defects. Dealer-maintained, non-smoking vehicle. Sold as-is with remaining Zurich extended warranty. Please message with any questions or for additional photos. Note listing may end early if car is sold locally. Note shipping can be arranged/facilitated at buyer's expense.
|
Cadillac CTS for Sale
2008 cadillac cts awd 3.6 di(US $16,500.00)
2012 cadillac cts 3.6l premium coupe sunroof nav 22k mi texas direct auto(US $31,980.00)
2012 cadillac cts 3.0 sedan auto leather blk on blk 13k texas direct auto(US $24,980.00)
2012 cadillac cts-4 performance coupe awd sunroof nav texas direct auto(US $33,980.00)
Cadillac ctsv coupe automatic navigation bose parktronic rearview camera(US $46,995.00)
2010 cadillac cts premium sedan 4-door 3.6l(US $17,900.00)
Auto Services in Michigan
Winners Auto & Cycle ★★★★★
Westborn Auto Service ★★★★★
Weber Transmission Company ★★★★★
Vaneck Auto Body ★★★★★
US Wheel Exchange ★★★★★
U Name IT Auto ★★★★★
Auto blog
GM, Pilot will build EVgo fast chargers at 500 truck stops across U.S.
Thu, Jul 14 2022All of our maps showing electric vehicle charging stations across the U.S. are going to need an update. Today, General Motors, Pilot and EVgo announced plans to work together on a nationwide DC fast charging network. The plan calls for 2,000 charging stalls that can deliver up to 350 kW to be installed at up to 500 Pilot and Flying J travel centers in the U.S. The goal is to have DC fast chargers available in 50-mile intervals across the country. The new charging stations will feature GM's "Ultium Charge 360" branding and "Pilot Flying J" logos but will not be limited to drivers of GM EVs. The plugs will use CCS connectors and be available to anyone. GM EV owners can take advantage of benefits, including the ability to make exclusive reservations, get discounts on charging costs and streamline the charging process with Plug and Charge and in-vehicle apps that can provide real-time charger availability. The first installation phase will take place in 2023, and "the bulk of the installations" should be completed by 2025, EVgo CEO Kathy Zoi said during a conference call with reporters announcing the plan. "We're gonna get going immediately and commence all of that engineering and planning stuff," she said. "We've got a pretty orderly plan." Pilot CEO Shameek Konar said the company expects the new EV charging stations to coexist with the current fuel infrastructure. "An average Pilot Flying J location is about 10 acres," Konar said. "This will be in addition to all of our gas pumps. The way I think about it is, this is a new source of energy that is going to coexist with gas for quite some time. We can debate how long, but we need to serve both groups of customers." Installing DC fast chargers at hundreds of Pilot's travel centers — aka truck stops — means there should be food, drinks, restrooms, WiFi and even showers available while you wait for an EV to charge. Pilot recently announced its “New Horizons” plan that will invest $1 billion in upgrading Pilot travel centers with more premium amenities, including expanded seating and lounge areas. While the exact amount of time it will take to charge an EV using these new stations will vary on the EV and its current state of charge, most EVs can refill from a low state of charge to around 80 percent in 20-30 minutes on a fast charger. The new stations are future-proofed to deliver up to 350 kW, a charge rate that few EVs today can handle.
2015 Cadillac ATS Coupe priced from $37,995*
Thu, 15 May 2014Cadillac has released pricing details on its new-for-2014 ATS Coupe. The new model, which will be available with buyer's choice of a 2.0-liter, turbocharged four-cylinder or a 3.6-liter V6 (the ATS Sedan's base 2.5 won't be making the trip) can be had with optional all-wheel-drive in place of the standard rear-wheel setup, while customers can also snag a six-speed manual or six-speed auto.
Prices start at $37,995, which represents a $2,900 premium over the 2014 ATS Sedan (pricing on the 2015 four-door isn't available yet) with the same 2.0-liter engine. Still, the ATS Coupe starts at just over $2,500 less than a base BMW 428i, which is also less powerful and offers less standard equipment. The Caddy is also less costly than the Mercedes-Benz C250 Coupe, although only by about $200. It's even cheaper than the Audi A5, which starts at $38,105, but that model includes all-wheel drive as standard. It should be noted that these prices are without their respective destination charges (*$995 for the Caddy, $925 each for the BMW and the Mercedes and $895 for the Audi).
Unfortunately, Cadillac hasn't released any additional pricing information beyond what we have here, so we can't tell you how much things like all-wheel drive, an automatic transmission or the 321-horsepower V6 will cost. That makes it difficult to figure out just how reasonable the ATS Coupe will be relative to its challengers, but so far, the value equation looks to be in the car's favor. When those full details roll in, though, you know where to look. Scroll down for the official press release from Cadillac.
Which electric cars can charge at a Tesla Supercharger?
Sun, Jul 9 2023The difference between Tesla charging and non-Tesla charging. Electrify America; Tesla Tesla's advantage has long been its charging technology and Supercharger network. Now, more and more automakers are switching to Tesla's charging tech. But there are a few things non-Tesla drivers need to know about charging at a Tesla station. A lot has hit the news cycle in recent months with regard to electric car drivers and where they can and can't plug in. The key factor in all of that? Whether automakers switched to Tesla's charging standard. More car companies are shifting to Tesla's charging tech in the hopes of boosting their customers' confidence in going electric. Here's what it boils down to: If you currently drive a Tesla, you can keep charging at Tesla charging locations, which use the company's North American Charging Standard (NACS), which has long served it well. The chargers are thinner, more lightweight and easier to wrangle than other brands. If you currently drive a non-Tesla EV, you have to charge at a non-Tesla charging station like that of Electrify America or EVgo — which use the Combined Charging System (CCS) — unless you stumble upon a Tesla charger already equipped with the Magic Dock adapter. For years, CCS tech dominated EVs from everyone but Tesla. Starting next year, if you drive a non-Tesla EV (from the automakers that have announced they'll make the switch), you'll be able to charge at all Supercharger locations with an adapter. And by 2025, EVs from some automakers won't even need an adaptor. Here's how to charge up, depending on which EV you have: Ford 2021 Ford Mustang Mach-E. Tim Levin/Insider Ford was the earliest traditional automaker to team up with Tesla for its charging tech. Current Ford EV owners — those driving a Ford electric vehicle already fitted with a CCS port — will be able to use a Tesla-developed adapter to access Tesla Superchargers starting in the spring. That means that, if you own a Mustang Mach-E or Ford F-150 Lightning, you will need the adapter in order to use a Tesla station come 2024. But Ford will equip its future EVs with the NACS port starting in 2025 — eliminating the need for any adapter. Owners of new Ford EVs will be able to pull into a Supercharger station and juice up, no problem. General Motors Cadillac Lyriq. Cadillac GM will also allow its EV drivers to plug into Tesla stations.