63 Chevy Ii Nova Ss 4 Speed, Vintage Air, 327 on 2040-cars
Anna, Illinois, United States
Body Type:HARDTOP
Engine:327
Vehicle Title:Clear
Fuel Type:Gasoline
For Sale By:Private Seller
Interior Color: Gray
Make: Chevrolet
Number of Cylinders: V8
Model: Nova
Trim: CHEVY II
Drive Type: REAR
Mileage: 100,000
Exterior Color: Blue
Warranty: Vehicle does NOT have an existing warranty
Chevrolet Nova for Sale
1963 nova ss convertible v8 auto pro touring street rat hot rod custom 63
Moonshadow motors 1972 chevy nova(US $4,670.00)
350 v8 heidts front end, custom bucket seat inerior, cragar ss wheels(US $22,900.00)
1974 chevrolet nova base coupe 2-door 5.7l(US $20,000.00)
1968 nova big block, 4 speed, correct colors, disc brakes, ultimate sleeper!
76 nova(US $5,000.00)
Auto Services in Illinois
Waukegan-Gurnee Auto Body ★★★★★
Walker Tire & Exhaust ★★★★★
Twin City Upholstery ★★★★★
Tuffy Auto Service Centers ★★★★★
Top Line ★★★★★
Top Gun Red ★★★★★
Auto blog
Most of the US won't get 2016 Chevy Volt
Tue, Sep 8 2015Every major plug-in vehicle launch in the US has been a patchwork operation, with automakers focusing their initial efforts on targeted locations like California where they expect to sell the most units. Today, we learned that even five years into the plug-in car project, the game remains the same. According to GM, the second-gen Chevy Volt is going to be rolled out in the same manner. In fact, GM is limiting availability of the 2016 model year Volt so much that most of the US will not have access to the car at all. For 39 states, the second-gen Volt will first be available as a 2017 model year vehicle at some point in the spring of 2016. When GM announced the buying process for the new Volt, it made it clear that dealers in California would be the first to place their orders. Hybrid Cars now reports that the first deliveries will be also limited to California and 10 other states that follow the California Air Resourced Board (CARB) rules: Connecticut, Massachusetts, Maryland , Maine, New Hampshire, New Jersey, New York, Oregon, Rhode Island, and Vermont. GM spokesman Kevin Kelly told AutoblogGreen that this is all according to plan. "Chevrolet has a shortened model year for the 2016 Chevy Volt that will have a limited distribution network," he said. "The 2016 Volt will be sold in our strongest EREV markets. The 2017 Chevrolet Volt will begin production early this spring and will be available throughout the country." It appears that non-CARB state Volt customers will be able to order their Volts starting October 1, according to documents posted on Hybrid Cars, where we also learn that 2016 Volt production for California started in August, will begin in late October for the other 10 CARB states, and in early 2016 for the rest of the US. Unsurprisingly, dealers outside of the 11 CARB states have been complaining that they can't order the much-anticipated new Volt for their customers just yet. Related Video:
GM extends production at Detroit factory until early 2020
Fri, Feb 22 2019General Motors Co said on Friday it had extended the production at its Detroit Hamtramck plant until January 2020, against an earlier plan to discontinue production in June this year. The No.1 U.S. automaker is revamping its operations, which include plant closures and thousands of job cuts, as it looks to boost profitability in the wake of declining U.S. auto sales. The Hamtramck plant will continue to produce the Chevrolet Impala and Cadillac CT6 sedans until early next year, the company said. "We are balancing production timing while continuing the availability of Cadillac advanced technology features currently included in the CT6-V — the Blackwing Twin-Turbo V-8 (engine) and Super Cruise (driver assistance system)," GM said. The plant has already discontinued production of the Buick LaCrosse sedan and Chevrolet Volt electric hybrid car. Detroit-based union United Auto Workers' President Gary Jones said GM's decision to continue production at the plant was a relief for the workers as well as their families. "We commend GM for today's decision and we reiterate the importance of a collective bargaining process in times like these," Jones said. Reporting by Ankit Ajmera. Related Video:
GM extends production cuts, affects Cadillacs, Camaro and Acadia
Thu, Apr 8 2021General Motors is extending production cuts at some of its North America factories due to a chip shortage that has roiled the global automotive industry, the U.S. carmaker said on Thursday. The move's impact has been baked into GM's prior forecast that the shortage could shave up to $2 billion off this year's profit. GM's Lansing Grand River assembly in Michigan will extend its downtime through the week of April 26. The plant makes Chevrolet Camaros and Cadillac CT4 and CT5 sedans. It has been out of action since March 15. GM's Spring Hill assembly in Tennessee will shut down for two weeks starting the week of April 12. The plant makes the Cadillac XT5, XT6 and GMC Acadia. The company said it has not taken downtime or reduced shifts at any of its more profitable full-size truck or full-size SUV plants due to the shortage. The news was first reported by CNBC. Reporting by Ankit Ajmera in Bengaluru; Editing by Maju Samuel and Sriraj Kalluvila























