Find or Sell Used Cars, Trucks, and SUVs in USA

2010 Land Rover Range Rover Sport Supercharged Sport Utility 4-door 5.0l on 2040-cars

US $58,995.00
Year:2010 Mileage:62500 Color: with white leather interior and black piping on the seats
Location:

Arlington, Virginia, United States

Arlington, Virginia, United States

I am looking to get rid of my beautiful 2010 Range Rover Supercharged. This is the BIG BODY!
This thing is fully loaded!Beautiful white exterior with white leather interior and black piping on the seats!

Has the following options:

Autobiography Grille and Vents
Navigation
Luxury Package
Adaptive Xenon Headlights
Keyless Entry and Start
Bluetooth for phone
Backup Camera
Towing kit for trailer (not just the standard hitch)- with electronics
DVD Video System- Two independently operated factory TV's in the headrest
Heated/Cooled Seats- Heated rear seats-Heated steering wheel
Clean Carfax!
New tires and brakes just put on!

THIS RANGE ROVER IS CERTIFIED TO 100K Miles Bumper to Bumper and is transferrable!

Feel free to Call or Text Zack @ 757-810-6994

62,xxx Miles but is still being driven daily

Auto Services in Virginia

Z Auto Body ★★★★★

Automobile Body Repairing & Painting, Car Wash
Address: 14049 Willard Rd, Clifton
Phone: (703) 802-3344

Wooddale Automotive Specialist ★★★★★

Auto Repair & Service
Address: 1051 Cannons Ct, Kingstowne
Phone: (703) 490-3319

White Tire Distributors ★★★★★

Auto Repair & Service, Tire Dealers, Brake Repair
Address: 1513 Seibel Dr NE, Hollins-College
Phone: (540) 342-3183

Vega MotorSport Window Tinting & Detailing ★★★★★

Auto Repair & Service, Automobile Parts & Supplies, Car Washing & Polishing Equipment & Supplies
Address: 11750 Pika Dr, Engleside
Phone: (301) 932-8342

Tysinger Motor Co., Inc. ★★★★★

Auto Repair & Service, New Car Dealers, Used Car Dealers
Address: 2712 Magruder Blvd, Sussex
Phone: (757) 865-8000

The Body Works of VA INC ★★★★★

Auto Repair & Service, Automobile Body Repairing & Painting, Automobile Parts & Supplies
Address: Belleview
Phone: (703) 777-5727

Auto blog

Jaguar Land Rover building new Special Vehicle Operations facility

Sun, 17 Aug 2014

It's only been a couple of months since Jaguar Land Rover announced the formation of its new Special Operations division, and we've already seen a number of vehicles to come out of it. But now the British automaker has announced a new facility that will house its elite skunkworks department.
Set to be built at Prologis Park in Ryton, England, on the outskirts of Coventry, the new Special Vehicle Operations Technical Centre will encompass dedicated production lines, F1-style flexible workshops, a dedicated paint studio and VIP suite for commissioning bespoke projects. JLR will spend some $33 million on the facility that will be home to 150 specialists - 100 of them being new hires.
The first project which the Special Operations division is working on is the F-Type Project 7, but we've already seen more projects in the pipeline - including the upcoming Range Rover Sport SVR - and you can bet there'll be more. The revival of the Lightweight E-Type also falls under Special Operations, but is undertaken by the Jaguar Heritage department located nearby at Browns Lane.

Jaguar demanding customer data from reluctant dealers

Tue, 25 Feb 2014


Nearly every major business is collecting consumer data these days, and keeping that data secure has come to the forefront of many customer's minds. Jaguar Land Rover North America's decision to begin requesting more customer info from its dealer network appears unfortunately timed, however. If it had come a few years ago, it might have been ignored, but in today's climate of heightened awareness, a few dealers are pushing back. To put the showrooms in an even tougher position, JLR NA is threatening to deny quarterly incentives if they do not turn over the customer data, according to Automotive News.
JLR NA instated the nationwide plan, which it calls Single View CRM, on February 7, but according to Stuart Schorr, Jaguar Land Rover North America Vice President of Communications, the automaker has been negotiating with its dealers to institute the new program for over a year. Schorr tells Autoblog that no financial information is being shared, noting that such data is limited to customer details, including things like what vehicles they own and whether they have any pending service. The initiative is meant to "improve customers' and owners' engagement with the brand," he said. Also, the company is not accessing dealer data itself; instead showrooms are asked to enter the info into JLR's database.

Jaguar opens new engine plant in the UK

Thu, 30 Oct 2014

The heads of Jaguar Land Rover are having a busy couple of weeks opening factories. Just days after inaugurating the company's first overseas plant in China, the automaker's new Engine Manufacturing Center in the UK is being inaugurated, as well. The plant near Wolverhampton, England, marks the first time in decades that JLR is building its own powerplants in-house. Further signaling the importance of this launch for the business, Queen Elizabeth II and Prince Philip were on hand and even tweeted about it.
The factory's first major project is to build JLR's latest Ingenium four-cylinders, starting with the 2.0-liter diesel version. "Our new Engine Manufacturing Centre is an important step in advancing the competitiveness and capability of the UK automotive sector. The production of in-house engines will support the expansion of the UK supply chain providing critical mass for inward investment," said Trevor Leeks, plant operations director in the automaker's announcement.
Opening the doors to the Engine Manufacturing Center has been years in the making for JLR. The plant was first announced in September 2011 and broke ground in June 2012. Building it cost the company 500 million pounds ($800 million) and created 1,400 new jobs. Of course, being a state-of-the-art factory, considerations were made to make the place as energy efficient as possible. That meant installing the UK's largest solar array with 21,000 panels to produce about 30 percent of the site's electricity needs.