Find or Sell Used Cars, Trucks, and SUVs in USA

Custom Supercharged Strut Grills Full Warranty Loaded on 2040-cars

Year:2012 Mileage:11476 Color: White /
 Black
Location:

Scottsdale, Arizona, United States

Scottsdale, Arizona, United States
Transmission:Automatic
Vehicle Title:Clear
Engine:5.0L 5000CC V8 GAS DOHC Supercharged
For Sale By:Dealer
Body Type:Sport Utility
Fuel Type:GAS
VIN: SALSH2E46CA729037 Year: 2012
Interior Color: Black
Make: Land Rover
Model: Range Rover Sport
Warranty: Vehicle has an existing warranty
Trim: Supercharged Sport Utility 4-Door
Power Options: Power Windows
Drive Type: 4WD
Mileage: 11,476
Sub Model: Supercharged
Number of Cylinders: 8
Exterior Color: White
Condition: Used: A vehicle is considered used if it has been registered and issued a title. Used vehicles have had at least one previous owner. The condition of the exterior, interior and engine can vary depending on the vehicle's history. See the seller's listing for full details and description of any imperfections. ... 

Land Rover Range Rover Sport for Sale

Auto Services in Arizona

Windshield Replacement Phoenix ★★★★★

Auto Repair & Service, Windshield Repair, Glass-Auto, Plate, Window, Etc
Address: 3309 N 70th St, Guadalupe
Phone: (602) 904-7237

Windshield Replacement & Auto Glass Repair Chandler ★★★★★

Auto Repair & Service, Windshield Repair, Glass-Broken
Address: 975 E Riggs Rd, Sun-Lakes
Phone: (480) 745-2403

University Motor Werks ★★★★★

Auto Repair & Service
Address: 2730 E McDowell Rd Ste 5, Guadalupe
Phone: (602) 225-1107

The Path Less Traveled Automotive ★★★★★

Auto Repair & Service, Brake Repair, Auto Transmission
Address: 10420 E Apache Trail, Apache-Junction
Phone: (480) 807-0100

Supreme Automotive ★★★★★

Automobile Parts & Supplies, Auto Body Parts
Address: 416 E Baseline Rd Ste 8, Chandler
Phone: (480) 558-4888

San Tan Automotive ★★★★★

Auto Repair & Service
Address: 22014 S Ellsworth Rd, Queen-Creek
Phone: (480) 987-0133

Auto blog

Jaguar Land Rover opens winter testing facility in Minnesota

Wed, 12 Dec 2012

As it begins the rollout of the all-wheel-drive Jaguar XJ and XF models, Jaguar Land Rover has just announced that it has opened a new facility in northern Minnesota for winter testing. Located in International Falls, MN (on the US and Canadian border), the British automaker says it is one of the coldest locations in the Continental US. Jaguar's new Instinctive All Wheel Drive system was developed primarily to help sell more cars in the northern US, so it only makes sense to open a testing area in the US as well.
With temperatures that can drop to minus 55 degrees Fahrenheit, International Falls was chosen to mimic some of the worst weather a Jaguar or Land Rover will ever see. The grounds house testing chambers, various road surfaces and even a frozen lake. This new facility complements the hot-weather testing grounds in Phoenix, AZ.
The official press release is posted below.

Jaguar may join the FWD, small-car parade

Tue, 13 Aug 2013

Was it right for Chevrolet to detune the 1975 Corvette's base engine to 165 horsepower? Was Aston Martin wrong to make the Toyota iQ-based Cygnet? Is BMW crazy to be testing the new 1 Series with three-cylinder engines and front-wheel drive? It seems now, just as in the 1970s and 1980s, that emissions regulations and social considerations are driving some automakers to adopt unbefitting practices to maintain acceptance in the eyes of governments and consumers. Jaguar has jumped on the bandwagon, and is considering development of small, frugal, front-wheel-drive cars to help lower Jaguar Land Rover's average vehicle CO2 levels in light of tightening European emissions regulations, Autocar reports.
By 2020, the European Union expects the model range of every manufacturer to average 95 grams per kilometer, which is a new law passed by the European Parliament in April. Manufacturers who make more than 300,000 vehicles per year must meet these targets, and JLR is expected to be producing up to 700,000 vehicles per year by then. CO2 regulations after 2020 will only get stricter, as EU politicians already are talking about lowering CO2 levels to between 68 g/km and 78 g/km. (To put that in perspective, Autocar posits that driving a fully charged electric vehicle in Europe produces about 75 g/km when factoring in the power-generation infrastructure.)
Jaguar has some choices here, but so far they all have drawbacks. It could develop a new, compact chassis architecture for a line of compact vehicles, but the investment required for such a project could be prohibitively expensive. Jaguar has been looking into using the Land Rover Evoque platform for a small SUV, Autocar reports, but Land Rover brand manager John Edwards raises issue with such a plan, saying it may not be financially feasible.

Jaguar opens new engine plant in the UK

Thu, 30 Oct 2014

The heads of Jaguar Land Rover are having a busy couple of weeks opening factories. Just days after inaugurating the company's first overseas plant in China, the automaker's new Engine Manufacturing Center in the UK is being inaugurated, as well. The plant near Wolverhampton, England, marks the first time in decades that JLR is building its own powerplants in-house. Further signaling the importance of this launch for the business, Queen Elizabeth II and Prince Philip were on hand and even tweeted about it.
The factory's first major project is to build JLR's latest Ingenium four-cylinders, starting with the 2.0-liter diesel version. "Our new Engine Manufacturing Centre is an important step in advancing the competitiveness and capability of the UK automotive sector. The production of in-house engines will support the expansion of the UK supply chain providing critical mass for inward investment," said Trevor Leeks, plant operations director in the automaker's announcement.
Opening the doors to the Engine Manufacturing Center has been years in the making for JLR. The plant was first announced in September 2011 and broke ground in June 2012. Building it cost the company 500 million pounds ($800 million) and created 1,400 new jobs. Of course, being a state-of-the-art factory, considerations were made to make the place as energy efficient as possible. That meant installing the UK's largest solar array with 21,000 panels to produce about 30 percent of the site's electricity needs.