1997 Land Rover Defender Base Sport Utility 2-door on 2040-cars
Mount Hood Parkdale, Oregon, United States
Please message me with questions at: marybellemttomsic@englandfans.com .
Very clean Land Rover Defender 90.
Always garage kept and serviced by Land Rover.
Now is your chance to own a prime example of the most Iconic 4x4 ever made.
AC blows ices cold, everything works and this defender has NO LEAKS not even the oil pan where most of these car leak from.
Brand new tires.
Front hitch for mounting a winch or maneuvering a boat trailer.
Front and rear Anderson Plugs ( gray power plugs) .
4 Vision X light bars and 2 vision X light cannons.
Tinted Soft top windows also has clear windows in storage bag.
Full length Surry top.
I have the back seat, it is in brand new condition will install.
Land Rover Defender for Sale
- 1997 land rover defender 90 station wagon(US $29,700.00)
- 1980 land rover defender(US $55,100.00)
- 1997 land rover defender(US $33,900.00)
- 1997 land rover defender(US $39,600.00)
- 1980 land rover defender 110(US $15,600.00)
- 1965 land rover defender series ll a 109(US $22,685.00)
Auto Services in Oregon
Zilkoski Auto Electric ★★★★★
Trifer Auto Glass & Window Tint ★★★★★
Stephenson Automotive ★★★★★
Salem Transmission Service ★★★★★
Ricks Quality Import Service ★★★★★
Richmond`s Service ★★★★★
Auto blog
Jaguar Land Rover opens winter testing facility in Minnesota
Wed, 12 Dec 2012As it begins the rollout of the all-wheel-drive Jaguar XJ and XF models, Jaguar Land Rover has just announced that it has opened a new facility in northern Minnesota for winter testing. Located in International Falls, MN (on the US and Canadian border), the British automaker says it is one of the coldest locations in the Continental US. Jaguar's new Instinctive All Wheel Drive system was developed primarily to help sell more cars in the northern US, so it only makes sense to open a testing area in the US as well.
With temperatures that can drop to minus 55 degrees Fahrenheit, International Falls was chosen to mimic some of the worst weather a Jaguar or Land Rover will ever see. The grounds house testing chambers, various road surfaces and even a frozen lake. This new facility complements the hot-weather testing grounds in Phoenix, AZ.
The official press release is posted below.
Jaguar Land Rover creates new Special Operations division for halo vehicles, bespoke commissions
Fri, 13 Jun 2014Jaguar Land Rover has announced that a new division of the British manufacturer will be dedicated to "bespoke commissions," as well as heritage products and apparel. Oh, and the new Special Operations division will also be behind JLR's halo cars from now on.
It's that last one that is the most tantalizing, as the last real halo product to see production from Jaguar was the XJ220. The Range Rover, meanwhile, has always had its own kind of halo reputation, although the Land Rover brand itself has never really gotten into the game with a dedicated model.
According to JLR, the new halo models will focus on ultra-high performance and luxury with a limited run of vehicles. The bespoke models, meanwhile, will give the wealthiest customers full sway over how vehicles are outfitted, with unique paints, trims and other accessories. The new SpecOps division will be run by John Edwards.
Jaguar opens new engine plant in the UK
Thu, 30 Oct 2014The heads of Jaguar Land Rover are having a busy couple of weeks opening factories. Just days after inaugurating the company's first overseas plant in China, the automaker's new Engine Manufacturing Center in the UK is being inaugurated, as well. The plant near Wolverhampton, England, marks the first time in decades that JLR is building its own powerplants in-house. Further signaling the importance of this launch for the business, Queen Elizabeth II and Prince Philip were on hand and even tweeted about it.
The factory's first major project is to build JLR's latest Ingenium four-cylinders, starting with the 2.0-liter diesel version. "Our new Engine Manufacturing Centre is an important step in advancing the competitiveness and capability of the UK automotive sector. The production of in-house engines will support the expansion of the UK supply chain providing critical mass for inward investment," said Trevor Leeks, plant operations director in the automaker's announcement.
Opening the doors to the Engine Manufacturing Center has been years in the making for JLR. The plant was first announced in September 2011 and broke ground in June 2012. Building it cost the company 500 million pounds ($800 million) and created 1,400 new jobs. Of course, being a state-of-the-art factory, considerations were made to make the place as energy efficient as possible. That meant installing the UK's largest solar array with 21,000 panels to produce about 30 percent of the site's electricity needs.