2011 Dodge Durango Express Auto Suv 3rd Row Seat Alloys Low Miles Warranty Wow!! on 2040-cars
Angola, Indiana, United States
Vehicle Title:Clear
For Sale By:Dealer
Engine:3.6L 3604CC 220Cu. In. V6 FLEX DOHC Naturally Aspirated
Body Type:Sport Utility
Fuel Type:FLEX
Make: Dodge
Warranty: Vehicle has an existing warranty
Model: Durango
Trim: Express Sport Utility 4-Door
Number of Doors: 4
Drive Type: RWD
Drivetrain: RWD
Mileage: 14,500
Sub Model: Express
Number of Cylinders: 6
Exterior Color: Gray
Interior Color: Gray
Dodge Durango for Sale
2008 dodge durango slt sport utility 4-door 5.7l
2007 dodge durango sxt sport utility 4-door 3.7l **super clean** adult owned(US $8,500.00)
2006 dodge durango slt 4-door magmun 5.7l hemi
03 durango, 4wd, sport, cloth, automatic, v8
Hemi limited leather loaded dvd sunroof heated seats cheap
1999 dodge durango slt 5.2l w/ 3rd row... no reserve
Auto Services in Indiana
Widco Transmissions ★★★★★
Townsend Transmission ★★★★★
Tom`s Midwest Muffler & Brake ★★★★★
Superior Auto ★★★★★
Such`s Auto Care ★★★★★
Shepherdsville Discount Auto Supply ★★★★★
Auto blog
1970 Hemi Challenger is a family heirloom with serious muscle
Wed, Dec 30 2015Petrolicious turns up the emotion in its latest video about a family's connection to their 1970 Dodge Challenger. The orange muscle car that gets the spotlight here is a remarkably beautiful vehicle, but the story of a father and his sons at the core of this clip might leave you feeling a little misty eyed. Juan Escalante is the current owner of this Challenger, but it belonged to his dad first. Juan's father spotted the iconic muscle car during the 1969 Detroit Auto Show and had to have one. He soon placed an order for the orange '70 Challenger R/T with the rare combination for that year of a 426 Hemi V8 and a four-speed manual gearbox. The family even brought the coupe with them when they moved to Venezuela in 1972, and local fans dubbed it El Hemi. However, parts were scarce for the muscle car in that country, and it returned to the US in 1996 for a restoration. Now, the rumbling Challenger with its Coke-bottle profile and black hood is the world's most awesome family heirloom for the Escalantes. In this poignant video, Petrolicious shows how the coupe connects Juan to his father. Related Video:
Stellantis pledges $2.8 billion investment in Canadian plants
Wed, May 4 2022Stellantis has re-upped its commitment to two pivotal Canadian factories. The Brampton Assembly Plant, where the Chrysler 300, Dodge Charger and Dodge Challenger are built, and the Windsor Assembly Plant, where the Chrysler Pacifica minivan is made, will receive a $2.8 million investment in the coming years. The announcement came as welcome news for Brampton, as the plant's future was very much in doubt. The company had only promised to build the three models, sharing an aged platform, through 2023. Now the future is more clear. Stellantis will begin retooling the facility in 2024 once production of the muscle car trio winds down. When it comes back online in 2025, it will produce "at least one all-new electric model". It will also serve as the production facility for an all-new flexible architecture, but which models it will support were not disclosed. As for Windsor, retooling will begin in 2023. Stellantis didn't say when it would finish, but that it would be home to a "new multi-energy vehicle (MEV) architecture that will provide battery-electric (BEV) capability for multiple models." Both plants are expected to return to a three-shift schedule after layoffs at the plants dropped them down to two shifts. The reaffirmation of investment in Canada follows last month's announcement that Stellantis and LG Energy Solution would establish a $4.1 billion joint venture to make battery packs for electric vehicles. The project is being billed as Canada's first large-scale lithium-ion battery plant. In addition, Windsor's Automotive Research and Development Centre (ARDC) will now become North America's first battery lab. Stellantis is expanding the site by 100,000 square feet, where engineers will conduct R&D into BEV, PHEV and HEV cells, modules and battery packs. Stellantis North America Chief Operating Officer Mark Stewart said, "These investments reaffirm our long-term commitment to Canada and represent an important step as we move toward zero-emission vehicles that deliver on our customers’ desire for innovative, clean, safe and affordable mobility.” Related video: This content is hosted by a third party. To view it, please update your privacy preferences. Manage Settings.
FCA to invest $4.5B for new Detroit plant, expanded production at current facilities
Tue, Feb 26 2019We expected some shifts in manufacturing plans as Fiat Chrysler plans to begin electrifying its Jeep brand, but this news bodes well for Michigan. FCA announced today that it would spend $4.5 billion to expand production in the state, including building a new assembly plant in Detroit and increasing capacity at five other facilities in the state. The plan, which FCA says will create nearly 6,500 new jobs, will help to meet increasing demand for Ram and Jeep products, and to electrify Jeep models. $1.6 billion will be set aside to transform the Mack Avenue Engine Complex into a site to build the next generation of Jeep Grand Cherokee, as well as an unspecified, new three-row Jeep model. FCA says this part of the plan will create 3,850 new jobs. FCA is increasing its investment in the Warren Truck plant to $1.5 billion in order to continue building the Ram 1500 Classic, as well as the new Jeep Wagoneer and Grand Wagoneer, creating 1,400 new jobs. FCA says that the new Ram 1500 Heavy Duty will still be built in Saltillo, Mexico. At FCA's Jefferson North facility, the automaker will invest $900 million to upgrade the plant. This site will continue to build the Dodge Durango, as well help build the next Jeep Grand Cherokee. FCA expects this to create 1,100 new jobs. As Jeep plans to electrify models in its SUV lineup, each of the above plants will produce plug-in hybrid versions of the Jeep models produced there, "with flexibility to build fully battery-electric models in the future," the company said in its announcement. "Three years ago, FCA set a course to grow our profitability based on the strength of the Jeep and Ram brands by realigning our U.S. manufacturing operations," said FCA CEO Mike Manley, referring in part to earlier investments in Illinois, Ohio and Michigan. "Today's announcement represents the next step in that strategy," Manley continued. "It allows Jeep to enter two white space segments that offer significant margin opportunities and will enable new electrified Jeep products, including at least four plug-in hybrid vehicles and the flexibility to produce fully battery-electric vehicles." Other investments include $119 million to move production of the 3.0-, 3.2- and 3.6-liter Pentastar engines from Mack I to the Dundee Engine Plant, and $400 million for increased capacity and 80 new jobs at the Sterling and Warren stamping plants. This comes at a time when FCA's U.S.
